Join 60,000+ competitive exam aspirants
A and B can complete a work in 15 days and 10 days, respectively. They started doing the work together but after 4 days, B had to leave, and A completed the remaining work alone. The entire work was completed in ______________ days.
10
9
5
6
9
Calculate LCM of 15 and 10 (30 units). Daily work A = 2, B = 3. Together they finish (2+3)*4 = 20 units in 4 days. Remaining 10 units done by A at rate 2: 10/2 = 5 days. Total = 4 + 5 = 9 days.
Time taken by A is 15 days, time taken by B is 10 days. They worked together for 4 days, then B left.
Work=Time├ЧEfficiency
Calculate LCM of 15 and 10 (30 units). Daily work A = 2, B = 3. Together they finish (2+3)*4 = 20 units in 4 days. Remaining 10 units done by A at rate 2: 10/2 = 5 days. Total = 4 + 5 = 9 days.
Many students calculate only the remaining work days (5) instead of the total days elapsed (4 + 5 = 9).
Calculate Efficiencies
Assume total work is the LCM of 15 and 10, which is 30 units. Efficiency of A is 30/15=2 units/day and B is 30/10=3 units/day.
EAтАЛ=2,EBтАЛ=3
Work done in 4 days
Together they work for 4 days. The total work completed by both is 4├Ч(2+3)=20 units.
WdoneтАЛ=4├Ч5=20
Calculate remaining work and time
Remaining work is 30тИТ20=10 units. A completes this alone at his efficiency of 2 units/day: 10/2=5 days.
TremainingтАЛ=210тАЛ=5
Final duration
The entire work takes the initial 4 days plus the remaining 5 days.
Total=4+5=9
B is correct because the total work completed by A and B in 4 days is 20 units, and the remaining 10 units are finished by A in 5 days, totaling 9 days.
This LCM method is identical to calculating the combined resistance in parallel circuits where 1/ReqтАЛ=1/R1тАЛ+1/R2тАЛ.