A and B complete a work in 2 days. If A alone can do it in 4 days then, B alone can do 20-times of the same work in ______________(days).
5
4
80
81
80
Use the work efficiency formula: If (A+B) takes 'x' days and A takes 'y' days, B takes (xy)/(y-x) days. Here (24)/(4-2) = 4 days. Multiply by 20 for 20-times work.
Work done by (A + B) in 2 days. Work done by A alone in 4 days.
B1тАЛ=A+B1тАЛтИТA1тАЛ
Use the work efficiency formula: If (A+B) takes 'x' days and A takes 'y' days, B takes (xy)/(y-x) days. Here (24)/(4-2) = 4 days. Multiply by 20 for 20-times work.
Many students calculate the work done by B in 1 day as 1/2 - 1/4 = 1/4 and assume 4 is the answer for 20-times work without multiplying.
Calculate B's work rate
Given A and B do the work in 2 days (1/2 per day) and A does it in 4 days (1/4 per day). Subtracting A's rate from the combined rate gives B's rate.
RateBтАЛ=21тАЛтИТ41тАЛ=41тАЛ
Calculate time for 1 unit of work
Since B's rate is 1/4 of the work per day, B completes 1 unit of work in 4 days.
T=1/41тАЛ=4┬аdays
Calculate time for 20-times the work
If B takes 4 days for 1 unit, B takes 4├Ч20 days for 20 units.
T20тАЛ=4├Ч20=80┬аdays
C is correct because the daily work rate of B is 1/4, meaning B takes 4 days for one unit of work and 80 days for 20-times the work.
This logic is identical to pipe and cistern problems where A and B represent different inlet/outlet rates.