Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalEconomics for Engineers
PrevNext

As per IS 4029:2010-Guide for Testing Three Phase Induction Motors. High Voltage test in special case performed at the site. The test voltage shall be__________ percent of the standard test voltage.

A

120

B

100

C

80

D

115

Correct Answer

Concept & PrincipleElectricalEconomics for Engineers
Option C

80

Quick Summary: According to IS 4029:2010, the high voltage test is typically performed at the factory with a standard test voltage. However, when the test must be performed at the installation site on a used or repaired motor, the test voltage is reduced to 80% of the factory-rated standard test voltage to avoid damage to the insulation.

💡 Explanation

According to IS 4029:2010, the high voltage test is typically performed at the factory with a standard test voltage. However, when the test must be performed at the installation site on a used or repaired motor, the test voltage is reduced to 80% of the factory-rated standard test voltage to avoid damage to the insulation.

🔢 Key Formulas

Vsite=0.8×VfactoryV_{site} = 0.8 \times V_{factory}Vsite​=0.8×Vfactory​ — Site test voltage calculation

Vstd=2Un+1000V_{std} = 2U_n + 1000Vstd​=2Un​+1000 — Standard factory test voltage formula for rated voltage UnU_nUn​

⚙️ Working Principle

The reduction in test voltage (to 80%) is a safety measure. Insulation systems degrade over time due to thermal, mechanical, and environmental stress. Applying the full factory-level voltage (which is meant for new insulation) on aged or site-exposed windings poses a risk of dielectric breakdown, potentially causing unnecessary failure of healthy equipment.

📌 Key Points
  • ▸

    IS 4029:2010 is the Indian Standard for testing three-phase induction motors.

  • ▸

    High Voltage (HV) tests verify the integrity of the ground wall insulation.

  • ▸

    Site conditions (dust, humidity, vibration) influence the insulation resistance levels.

  • ▸

    Reducing test voltage prevents 'testing to destruction' on aged insulation.

✅ Advantages
  • ▸

    Prevents catastrophic breakdown of aged insulation during testing.

  • ▸

    Allows verification of dielectric integrity after site repairs or overhauls.

❌ Disadvantages / Limitations
  • ▸

    Less stringent than factory testing, potentially missing minor insulation weaknesses.

  • ▸

    Site-specific environmental factors can lead to inconsistent readings.

🛠️ Applications / Uses
  • ▸

    Post-repair testing at project sites.

  • ▸

    Preventive maintenance schedules for large induction motors.

  • ▸

    Commissioning of refurbished motors in industrial plants.

📄 Additional Information
  • ▸

    The standard test voltage for new machines is usually 2Un+10002U_n + 10002Un​+1000V, applied for one minute.

  • ▸

    Option 100% (B) would be applicable only for new equipment tested at the factory.

  • ▸

    The 80% rule is specific to site conditions as per Indian Standard guidelines.

📊 Diagram / Illustration
Site HV Test Calculation
Vsite=0.8×VfactoryV_{site} = 0.8 \times V_{factory}Vsite​=0.8×Vfactory​
Where VfactoryV_{factory}Vfactory​ is the standard test voltage
Standard Test Voltage = 2Un+10002U_n + 10002Un​+1000 Volts
✅

C is correct — The high voltage test for three-phase induction motors when conducted at the site must be performed at 80% of the standard factory test voltage.

Core Concepts Used
Click any tag to open in AI Tutor
Dielectric Strength Testing IS 4029:2010 Standards Insulation Coordination
💡 EXAM TIP

Always distinguish between 'Factory Testing' (full stress) and 'Site/Maintenance Testing' (reduced stress) in electrical machine standards as this is a common theme in JE/AE exams.

Related Questions

ElectricalEconomics for Engineers
Wha is the indication of the second digit in IP code?
ElectricalEconomics for Engineers
Wha is the indication of the first digit in IP code?
ElectricalEconomics for Engineers
The designation used for the _____________ consists of the letters IP followed by two characteristic numerals si
ElectricalEconomics for Engineers
What is IP code in rotating machine?
ElectricalEconomics for Engineers
In which of the following enclosure, we can not stop water from entering into the machine?

Discussion (0)