As the size of a thermal generating unit increases, the capital cost per kW of installed capacity
Increases
Decreases
Remains same
May increase or decrease
Decreases
As the capacity of a thermal generating unit increases, the capital cost per kW of installed capacity decreases due to the economies of scale. Larger units require proportionately fewer materials, smaller building footprints per MW, and shared auxiliary systems, leading to a reduction in the specific cost.
As the capacity of a thermal generating unit increases, the capital cost per kW of installed capacity decreases due to the economies of scale. Larger units require proportionately fewer materials, smaller building footprints per MW, and shared auxiliary systems, leading to a reduction in the specific cost.
CunitтАЛ=InstalledCapacity(kW)TotalCapitalCostтАЛ тАФ The specific cost definition representing capital expenditure per unit power.
The principle of economies of scale dictates that doubling the capacity of a plant does not result in doubling the cost of construction. Costs related to site preparation, administrative buildings, control rooms, and auxiliary infrastructure (like coal handling plants or cooling water systems) do not increase linearly with the turbine-generator size. Consequently, the fixed costs are distributed over a larger number of kilowatts, lowering the cost per unit.
Economies of scale lead to a non-linear relationship between plant capacity and total investment.
Fixed costs like land, site development, and infrastructure overheads are diluted at higher capacities.
Higher capacity units often provide better thermal efficiency (heat rate), further reducing operating costs over time.
Lower initial investment per kW.
Reduced operating staff requirement per MW.
Improved fuel economy due to higher operational efficiency.
Higher risk in case of unit failure as it impacts a larger percentage of total grid capacity.
Longer construction time and higher initial total capital outlay.
Requirement for a larger grid to maintain system stability under N-1 contingency.
Baseload thermal power stations.
Large-scale supercritical and ultra-supercritical power plants.
This behavior is governed by the 'Power Law' of capital costs, which typically follows C2тАЛ=C1тАЛ├Ч(P2тАЛ/P1тАЛ)n where n is often between 0.6 and 0.8.
Option A is incorrect because it implies diseconomies of scale which occur only under extreme circumstances or poor design.
B is correct тАФ The capital cost per kW decreases due to economies of scale where fixed infrastructure costs are spread across a larger capacity.
Always remember that while cost per kW decreases with size, the 'reliability risk' increases, which is why large units are typically connected to highly interconnected power grids.