Join 60,000+ competitive exam aspirants
In January 2026, DRDO successfully tested its full-scale scramjet engine at the Scramjet Connect Pipe Test (SCPT) facility in Hyderabad. What was the key result of this test?
Long hypersonic engine run for over twelve minutes
Short supersonic flight using regular engines
Launch of a ready-to-use hypersonic missile
Development of a new guided missile system
Long hypersonic engine run for over twelve minutes
Practice and solve "In January 2026, DRDO successfully tested its full-scale scramjet engine at the Scramjet Connect Pip..." for General Awareness and Current Affairs - Previous Year Paper 2026. The correct answer is Option A: Long hypersonic engine run for over twelve minutes. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.
Practice and solve "In January 2026, DRDO successfully tested its full-scale scramjet engine at the Scramjet Connect Pip..." for General Awareness and Current Affairs - Previous Year Paper 2026. The correct answer is Option A: Long hypersonic engine run for over twelve minutes. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.