Join 60,000+ competitive exam aspirants
A, B, and C alone can do a piece of work in 9, 12 and 18 days, respectively. They all started the work together, but A left after 3 days. In how many days, was the total work completed?
25тАЛ
524тАЛ
2
59тАЛ
524тАЛ
Calculate LCM of (9, 12, 18) = 36 units. Total work done by A, B, C in 3 days is 3 ├Ч(4+3+2)=27units. Remaining work 9 units is done by (B+C) at rate (3+2)=5 units/day, taking 9/5 days. Total = 3 + 9/5 = 24/5 days.
A, B, and C can complete a work in 9, 12, and 18 days respectively. They all start together, but A leaves after 3 days.
Work=Time├ЧEfficiency
Calculate LCM of (9, 12, 18) = 36 units. Total work done by A, B, C in 3 days is 3 ├Ч(4+3+2)=27units. Remaining work 9 units is done by (B+C) at rate (3+2)=5 units/day, taking 9/5 days. Total = 3 + 9/5 = 24/5 days.
Confusing the number of days A worked with the total number of days the work lasted; remember to add the initial 3 days to the remaining time calculation.
Calculate Efficiency
Find the LCM of 9, 12, and 18, which is 36. Efficiencies are: A = 36/9 = 4, B = 36/12 = 3, C = 36/18 = 2.
EfficiencyAтАЛ=4,EfficiencyBтАЛ=3,EfficiencyCтАЛ=2
Work done in 3 days
A, B, and C worked together for 3 days. Total work done = 3├Ч(4+3+2)=27 units.
Work3daysтАЛ=3├Ч9=27
Calculate Remaining Work
Remaining work is the total minus work already completed.
WorkremтАЛ=36тИТ27=9
Final Time Calculation
B and C complete the remaining 9 units at their combined efficiency of 3+2=5. Total days = 3+59тАЛ=515+9тАЛ=524тАЛ.
Time=3+59тАЛ=524тАЛ
B is correct because the total time taken to complete the work is 24/5 days.
This approach is standard for all work-sharing problems; always define 'Total Work' as the LCM of individual times to simplify calculations.