Join 60,000+ competitive exam aspirants
Siding owner should inform to zonal railways at least ____ working days in advance for inclusion of co-users in FOIS.
7
10
15
None of these
7
According to Indian Railways FOIS (Freight Operations Information System) guidelines for siding operations, the siding owner is required to inform the zonal railway at least 7 working days in advance for the inclusion of co-users.
According to Indian Railways FOIS (Freight Operations Information System) guidelines for siding operations, the siding owner is required to inform the zonal railway at least 7 working days in advance for the inclusion of co-users.