The annual coat of generation in form of Rs. (A + B├ЧkW + C├ЧkWh) where A, B and C are constants and kW and kWh represents capacity of the station and energy generated per year respectively. The choice between base load station and peak load station basically depends on the fact that
Factor B should be less for peak load station and factor C should be less for base load station
Factor C should be less for peak load station and factor B should be less for base load station
Factor B and C should be less for base load station
Factor B and C should be less for peak load station
Factor B should be less for peak load station and factor C should be less for base load station
The total cost of electricity generation is expressed as CtotalтАЛ=A+B(kW)+C(kWh), where 'B' represents the fixed cost per unit capacity and 'C' represents the variable operating cost per unit energy. Base load stations operate for long hours (high kWh), requiring a low 'C' to ensure economy, while peak load stations operate for short durations (low kWh), requiring a low 'B' to minimize capital investment.
The total cost of electricity generation is expressed as CtotalтАЛ=A+B(kW)+C(kWh), where 'B' represents the fixed cost per unit capacity and 'C' represents the variable operating cost per unit energy. Base load stations operate for long hours (high kWh), requiring a low 'C' to ensure economy, while peak load stations operate for short durations (low kWh), requiring a low 'B' to minimize capital investment.
CtotalтАЛ=A+BтЛЕkW+CтЛЕkWh тАФ Total annual cost of generation
The choice is driven by the utilization factor. Base load plants, such as nuclear or large thermal plants, have high capital costs (B) but low fuel/running costs (C). Conversely, peak load plants, such as gas turbines or hydro-storage, are designed with lower initial capital costs (B) to justify their intermittent operation, even if their running costs (C) per unit are higher.
Base load stations: High capacity factor, priority on low fuel cost (C).
Peak load stations: Low capacity factor, priority on low initial investment (B).
Factor 'A' represents the fixed administrative and annual charges independent of capacity.
The total generation cost is minimized by matching plant characteristics to the load duration curve.
Minimizes overall cost of power generation
Improves reliability and stability of the power grid
Complexity in load scheduling
Increased risk of supply shortage if demand forecasts are incorrect
Economic dispatch in smart grids
Power system planning and infrastructure investment
| Feature | Base Load | Peak Load |
|---|---|---|
Cost Priority | Low Factor C | Low Factor B |
Base load plants typically run for > 6000 hours per year.
Peak load plants may run for as little as 500-1500 hours per year.
Option B, C, and D are incorrect because they suggest conditions that would make electricity generation economically unviable or inefficient.
A is correct тАФ Base load stations require low variable costs (C) due to high annual energy generation, whereas peak load stations require low fixed costs (B) due to low utilization.
Always remember: 'Base = Big hours (Low C needed), Peak = Poor utilization (Low B needed)' for quick exam recall.