The most appropriate operating speeds in rpm of generators used in thermal, nuclear and hydro power plants would respectively be
3000, 300 and 1500
3000, 3000 and 300
1500, 1500 and 3000
1000, 900 and 750
3000, 3000 and 300
Thermal and nuclear power plants use high-speed cylindrical rotor turbo-alternators typically operating at 3000 rpm for 50 Hz systems (2-pole). In contrast, hydro power plants use slow-speed salient pole rotors due to lower water turbine speeds and higher pole counts, commonly operating at speeds like 300 rpm.
Thermal and nuclear power plants use high-speed cylindrical rotor turbo-alternators typically operating at 3000 rpm for 50 Hz systems (2-pole). In contrast, hydro power plants use slow-speed salient pole rotors due to lower water turbine speeds and higher pole counts, commonly operating at speeds like 300 rpm.
NsтАЛ=P120fтАЛ тАФ relationship between synchronous speed, frequency, and number of poles
The synchronous speed of a generator is governed by NsтАЛ=P120fтАЛ. Thermal and nuclear turbines are high-efficiency, high-pressure steam turbines optimized for high speeds (usually 3000 rpm). Hydro turbines, driven by large volumes of water at lower heads, require many poles to achieve the 50 Hz frequency, resulting in lower rotational speeds.
Thermal/Nuclear generators use 2-pole cylindrical rotors (3000 rpm at 50 Hz).
Hydro generators use multi-pole salient rotors to maintain 50 Hz at low speeds.
Higher pole count decreases the rotational speed NsтАЛ.
High speed in thermal/nuclear plants reduces size and weight of the generator.
Low speed in hydro plants accommodates massive turbines and high torque requirements.
High centrifugal stress in turbo-alternators requires high-strength materials.
Large physical size of low-speed hydro generators increases capital cost.
Steam power plants
Nuclear power stations
Run-of-river and reservoir hydro plants
| Feature | Cylindrical Rotor | Salient Pole Rotor |
|---|---|---|
Generator Type | Turbo-alternator (Thermal/Nuclear) | Hydro-alternator |
Standard power frequency in India is 50 Hz.
Option A is incorrect because 300 rpm for thermal plants is physically too slow for steam efficiency.
Option C is incorrect as it assigns 1500 rpm to thermal plants (4-pole) which is non-standard for utility-scale steam sets.
B is correct тАФ Thermal and nuclear plants operate at 3000 rpm (2-pole), while hydro plants operate at lower speeds (e.g., 300 rpm) due to high pole counts.
Always remember the PтИТN inverse relationship: as pole count P increases, speed NsтАЛ decreases. This is why hydro generators are visibly larger in diameter than turbo-alternators.