Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
ЁЯЫТ0
рдЕA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
┬й 2026 Examoogle. India's #1 competitive exam AI tutor.
ЁЯФТ SSL SecuredЁЯУ▒ UPI AcceptedЁЯз╛ GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
SubtotalтВ╣0
TotalтВ╣0
Examoogle тАв User тАв info@examoogle.com тАв EE-2024-8821
Chapter 1 of 12 тАв Page 1 of 248ЁЯФТ Protected PDF тАв Watermarked
Back to Practice Questions
CivilAdvanced Survey
PrevNext

What is the first thing done by the surveyor after setting up the instrument?

A

releasing all clamps

B

levelling instrument

C

turning plates

D

clamping the plates

Correct Answer

тЪЩя╕П TE тАв Technical Concept & PrincipleCivilAdvanced Survey
Option B

levelling instrument

Quick Summary:

After setting up the tripod and theodolite, the surveyor must perform centering followed immediately by levelling. Levelling ensures the vertical axis of the instrument is perfectly plumb, which is the fundamental prerequisite for accurate angular measurements in both horizontal and vertical planes.

тЪЩя╕ПTETechnical SolutionConcept & Principle
ЁЯТб Explanation

After setting up the tripod and theodolite, the surveyor must perform centering followed immediately by levelling. Levelling ensures the vertical axis of the instrument is perfectly plumb, which is the fundamental prerequisite for accurate angular measurements in both horizontal and vertical planes.

ЁЯФв Key Formulas

Ttotal=Tc+Tl+TfT_{total} = T_c + T_l + T_fTtotalтАЛ=TcтАЛ+TlтАЛ+TfтАЛ тАФ Total setup time represented as sum of centering, levelling, and focusing times.

тЪЩя╕П Working Principle

The levelling process involves adjusting the foot screws (or levelling screws) to move the bubble of the plate level to the center of its run. This alignment ensures that the horizontal plate is perpendicular to the plumb line (gravity vector), ensuring that subsequent angular readings are not affected by instrumental tilt.

ЁЯУМ Key Points
  • тЦ╕

    Centering brings the instrument exactly over the station mark using a plumb bob or optical plummet.

  • тЦ╕

    Levelling is performed using the foot screws and the plate level (spirit level).

  • тЦ╕

    Proper levelling ensures the vertical axis is truly vertical, preventing error in horizontal angle measurement.

  • тЦ╕

    The sequence of instrument setup is standard: Centering -> Levelling -> Focusing (CLF).

тЬЕ Advantages
  • тЦ╕

    Minimizes systematic errors in angular observations.

  • тЦ╕

    Ensures stable and reliable data for triangulation or traverse surveys.

тЭМ Disadvantages / Limitations
  • тЦ╕

    Time-consuming if the ground is uneven.

  • тЦ╕

    Required repeatedly if the tripod is bumped or disturbed.

ЁЯЫая╕П Applications / Uses
  • тЦ╕

    Traversing in land surveying.

  • тЦ╕

    Triangulation for large-scale mapping.

  • тЦ╕

    Setting out works in civil construction.

ЁЯУД Additional Information
  • тЦ╕

    Levelling must be checked at every station to ensure no movement occurred during setup.

  • тЦ╕

    Option A is incorrect because releasing clamps is part of the preparation, not the primary stabilization step.

  • тЦ╕

    Option C and D relate to the manipulation of plates for measurement, which occurs after the instrument is established.

ЁЯУК Diagram / Illustration
Fundamental Surveying Sequence1. Centering2. Levelling
тЬЕ

B is correct тАФ Levelling the instrument is the primary step to define a horizontal datum for angular measurements.

Core Concepts Used
Click any tag to open in AI Tutor
Instrument Centering Instrument Levelling Vertical Axis Definition
ЁЯТб EXAM TIP

Always remember the acronym 'CLF' (Centering, Levelling, Focusing) for the standard setup sequence in surveying instruments like theodolites and total stations.

Related Questions

CivilAdvanced Survey
From a station, we measured as many objects as possible within the sight, that method called to__.
CivilAdvanced Survey
In which are not scale factor in total station ?
CivilAdvanced Survey
How many counts are scale factors in total station ?
CivilAdvanced Survey
Which of the following fundamental parameter for total station?
CivilAdvanced Survey
Which type of method has used in conventional surveying for recording data ?

Discussion (0)

Loading discussion...
PrevNext