When an economical canal cross-section is formed partly in cutting and partly in filling, such that the quantity of earth in cutting is equal to the quantity of earth in filling, the depth of cutting under that situation is known as __________.
Critical depth
Economical depth
Uniform depth
Balancing depth
Balancing depth
The balancing depth is the specific depth of a canal where the volume of earth excavated from the cutting exactly equals the volume required for filling the banks. This approach is highly economical as it minimizes the cost and time associated with the transportation of earthwork, effectively eliminating the need for borrow pits or spoil banks.
IS 4701:1982
The balancing depth is the specific depth of a canal where the volume of earth excavated from the cutting exactly equals the volume required for filling the banks. This approach is highly economical as it minimizes the cost and time associated with the transportation of earthwork, effectively eliminating the need for borrow pits or spoil banks.
AcuttingтАЛ=AfillingтАЛ
When a canal is constructed, the earth excavated from the ground (cutting) is utilized to form the embankments (filling) on either side. At the balancing depth, the cross-sectional area of the cutting (AcтАЛ) equals the cross-sectional area of the filling (AfтАЛ). The total volume is balanced by calculating the depth where the earth moved is self-contained within the site boundaries.
Balancing depth is achieved when the cost of excavation is balanced by the cost of filling.
It eliminates the need for borrow pits, which reduces land acquisition and earth transportation costs.
The canal bed level is designed such that the required earthwork for the banks is obtained from the cutting itself.
If the depth is greater than the balancing depth, extra earth must be disposed of (spoil bank); if less, extra earth must be brought in (borrow pit).
Reduction in total project cost.
Efficient use of excavated materials.
Reduced environmental impact due to minimal earth handling.
Limited by site topography and soil properties.
May require more land width in flat areas.
Design of irrigation canals in plains.
Optimization of canal alignment in large-scale hydraulic projects.
Option A (Critical depth) refers to the depth at which the specific energy is minimum, related to Froude number equal to 1.
Option B (Economical depth) generally refers to the depth that provides the most efficient hydraulic cross-section (minimum wetted perimeter).
Option C (Uniform depth) refers to a condition of constant flow depth along the length of the channel.
D is correct тАФ Balancing depth represents the point where excavated material from cutting matches the requirement for filling.
Always distinguish between 'Hydraulically Efficient Section' (minimum perimeter) and 'Economical Depth' (minimum earthwork/balancing depth) in exam questions.