Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Which activities performed during periodic maintenance in all machine?

A

Voltage check

B

Current check

C

Connection check

D

Replacement of worn out parts

Correct Answer

Concept & PrincipleElectricalPower System
Option D

Replacement of worn out parts

Quick Summary: Periodic maintenance is a scheduled program of inspection and restoration to prevent machine failure. While tasks like voltage and current monitoring are part of daily or operational checks, the physical replacement of worn-out parts based on service life or wear indicators constitutes the core action for maintaining long-term equipment integrity.

💡 Explanation

Periodic maintenance is a scheduled program of inspection and restoration to prevent machine failure. While tasks like voltage and current monitoring are part of daily or operational checks, the physical replacement of worn-out parts based on service life or wear indicators constitutes the core action for maintaining long-term equipment integrity.

🔢 Key Formulas

MTBF=1λMTBF = \frac{1}{\lambda}MTBF=λ1​ — Mean Time Between Failures, where λ\lambdaλ is the failure rate.

Availability=MTBFMTBF+MTTRAvailability = \frac{MTBF}{MTBF + MTTR}Availability=MTBF+MTTRMTBF​ — Ratio of uptime to total time, highlighting why replacement reduces Mean Time To Repair (MTTR).

⚙️ Working Principle

The principle relies on the 'Bathtub Curve' of reliability, which identifies the wear-out phase of components. By replacing parts before they reach catastrophic failure, the Mean Time Between Failures (MTBF) is extended and the overall machine availability is maximized.

📌 Key Points
  • ▸

    Preventive maintenance aims to minimize unscheduled downtime.

  • ▸

    Worn-out parts replacement is based on manufacturer recommendations or condition monitoring.

  • ▸

    Electrical checks (voltage/current) are monitoring tasks, whereas part replacement is restorative.

  • ▸

    Reduces the probability of cascading failures in complex systems.

✅ Advantages
  • ▸

    Increased equipment lifespan

  • ▸

    Enhanced operational safety

  • ▸

    Reduction in emergency repair costs

❌ Disadvantages / Limitations
  • ▸

    Scheduled downtime required

  • ▸

    Cost of spare parts inventory

  • ▸

    Potential for human error during disassembly

🛠️ Applications / Uses
  • ▸

    Industrial motor maintenance

  • ▸

    Power transformer bushing replacement

  • ▸

    Bearing lubrication and renewal

📄 Additional Information
  • ▸

    Options A, B, and C describe diagnostic monitoring activities that determine the need for maintenance, while D describes the actual corrective activity performed during the maintenance window.

  • ▸

    Maintenance schedules are often determined by the 'Run-to-failure' vs 'Time-based' vs 'Condition-based' methodologies.

📊 Diagram / Illustration
Maintenance CycleInspection & DiagnosisReplacement of Worn Parts
✅

D is correct — The replacement of worn-out parts is the definitive physical activity performed during periodic maintenance to restore the machine to its design capability.

Core Concepts Used
Click any tag to open in AI Tutor
Preventive Maintenance Reliability Engineering Equipment Lifecycle Management
💡 EXAM TIP

Always distinguish between monitoring/inspection (finding a problem) and maintenance/overhaul (fixing the problem). Exam questions often use monitoring activities as distractors.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______