Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Which among these tests are performed periodically?

A

Repair test

B

Maintenance test

C

Manufacture test

D

All of these

Correct Answer

Concept & PrincipleElectricalPower System
Option B

Maintenance test

Quick Summary: Maintenance tests are performed periodically on electrical equipment like transformers and circuit breakers to ensure their reliable operation and to monitor their degradation over time. Unlike manufacture or repair tests which are 'one-time' events, maintenance testing is an integral part of a scheduled preventive maintenance program.

💡 Explanation

Maintenance tests are performed periodically on electrical equipment like transformers and circuit breakers to ensure their reliable operation and to monitor their degradation over time. Unlike manufacture or repair tests which are 'one-time' events, maintenance testing is an integral part of a scheduled preventive maintenance program.

🔢 Key Formulas

Rins=VIR_{ins} = \frac{V}{I}Rins​=IV​ — Insulation resistance measurement

Ploss=VIcos⁡ϕP_{loss} = V I \cos \phiPloss​=VIcosϕ — Determination of power factor/dissipation factor

⚙️ Working Principle

The principle relies on monitoring the 'Health Index' of assets by measuring parameters such as Insulation Resistance (IR), Dissipation Factor (Tan δ\deltaδ), Contact Resistance, and Dielectric Strength of insulating oil. By comparing periodic test results against the manufacturer's baseline data and previous readings, engineers can identify incipient faults, such as insulation deterioration or contact wear, before catastrophic failure occurs.

📌 Key Points
  • ▸

    Preventive maintenance aims to minimize unplanned downtime.

  • ▸

    Periodic tests include Insulation Resistance (Megger test), Transformer Oil testing (BDV), and Contact Resistance measurement (Ductor test).

  • ▸

    Maintenance testing follows industry standards like IS 2026 for transformers and IS 13118 for circuit breakers.

  • ▸

    Trend analysis of periodic data helps in 'Condition-Based Monitoring' (CBM).

✅ Advantages
  • ▸

    Detects potential insulation failure early

  • ▸

    Extends the operational life of the asset

  • ▸

    Reduces catastrophic failure risks

❌ Disadvantages / Limitations
  • ▸

    Requires scheduled system outages

  • ▸

    Increased operational labor costs

🛠️ Applications / Uses
  • ▸

    Power Transformers in Grid Substations

  • ▸

    High Voltage Circuit Breakers (SF6/Vacuum)

  • ▸

    Rotating Machines (Motors/Generators)

📄 Additional Information
  • ▸

    Manufacture tests (Factory Acceptance Tests) are done at the factory before shipping.

  • ▸

    Repair tests are conducted post-overhaul to confirm the equipment is fit for re-energization.

  • ▸

    Maintenance tests are strictly time-based (e.g., annually or every 2 years) or condition-based.

📊 Diagram / Illustration
Maintenance Testing CycleBaseline DataPeriodic Field Test
✅

B is correct — Maintenance tests are systematic, recurring evaluations conducted throughout the service life of electrical equipment to ensure safety and reliability.

Core Concepts Used
Click any tag to open in AI Tutor
Preventive Maintenance Condition Monitoring Asset Life Cycle Management
💡 EXAM TIP

Always remember: Factory Acceptance Tests (FAT) verify design compliance, while Maintenance tests verify ongoing performance integrity.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______