Join 60,000+ competitive exam aspirants
Who shall bear the cost of the installation and comprehensive Annual Maintenance Contract (AMC) of the EIMWB
Finance Ministry
The Accounts department of the Division
Zonal Railway
GCTO
GCTO
As per railway guidelines regarding EIMWB (Electronic In-Motion Weigh Bridge), the cost of installation and AMC is typically borne by the GCTO (Gati Shakti Cargo Terminal Operator).
As per railway guidelines regarding EIMWB (Electronic In-Motion Weigh Bridge), the cost of installation and AMC is typically borne by the GCTO (Gati Shakti Cargo Terminal Operator).