Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
PrevNext

Why are ground wires installed at the top of 400 kV transmission towers?

A

To provide shielding of phase conductors from switching surges.

B

To provide shielding of phase conductors from lightning strokes

C

To improve mechanical strength of the conductors

D

To reduce corona loss in phase conductors

Correct Answer

⚙️ TE • Technical Verified Solution01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
Option B

To provide shielding of phase conductors from lightning strokes

Quick Summary:

Practice and solve "Why are ground wires installed at the top of 400 kV transmission towers?..." for 01 ADDITIONALASSISTANTENGINEERELECTRICAL - GSSSBAAEElectrical 2026. The correct answer is Option B: To provide shielding of phase conductors from lightning strokes. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.

Concept & Solution

Practice and solve "Why are ground wires installed at the top of 400 kV transmission towers?..." for 01 ADDITIONALASSISTANTENGINEERELECTRICAL - GSSSBAAEElectrical 2026. The correct answer is Option B: To provide shielding of phase conductors from lightning strokes. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.

Related Questions

01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
In flux control (field weakening), how does reducing the field current affect the motor's speed and torque?
01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
A એક કામ 14 દિવસમાં પૂરું કરી શકે છે અને B તે જ કામ 18 દિવસમાં પૂરું કરી શકે છે. જો તેઓ સાથે મળીને 4 દિવસ કામ કરે, તો કેટલા ભાગનું કામ બાકી રહેશે?
01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
બહુકોણ ABCDEF નું ક્ષેત્રફળ શોધો. (sq.cm માં)
01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
Building electrical installations in India should primarily comply with which regulations/standards to ensure electrical safety and proper installatio
01 ADDITIONAL ASSISTANT ENGINEER ELECTRICALGSSSB AAE Electrical 2026
In the question given below, out of four alternatives, choose the one that can be substituted for the highlighted words.The one who sells sweets and p

Discussion (0)