Join 60,000+ competitive exam aspirants
9 men can do a piece of work in 21 days. The number of men required to complete the same work in 3 days is:
64
62
67
63
63
Practice and solve "9 men can do a piece of work in 21 days. The number of men required to complete the same work in 3 d..." for Mathematics - Previous Year Paper 2024. The correct answer is Option D: 63. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.
Practice and solve "9 men can do a piece of work in 21 days. The number of men required to complete the same work in 3 d..." for Mathematics - Previous Year Paper 2024. The correct answer is Option D: 63. Detailed step-by-step solution, conceptual clarity, and formulas on Examoogle.