A generating station which has a high investment cost and low operating cost is usually operated as a
Peak load station
Base load station
Medium load station
None of above
Base load station
A generating station with high fixed capital investment and low fuel/operating costs is designed to operate as a base load station. By running at high capacity factors, the fixed costs are distributed over a large number of units generated, minimizing the cost per kilowatt-hour.
A generating station with high fixed capital investment and low fuel/operating costs is designed to operate as a base load station. By running at high capacity factors, the fixed costs are distributed over a large number of units generated, minimizing the cost per kilowatt-hour.
CostunitтАЛ=EnergyGenerated(kWh)Fixed┬аCost+OperatingCostтАЛ
Capacity┬аFactor=MaxOutput├ЧTimeActualOutputтАЛ
The selection of a power plant as a base load station depends on its 'Generation Cost' vs 'Capacity Factor' characteristics. Plants like nuclear or large run-of-river hydro have very high initial setup costs but extremely low fuel expenses. To achieve the lowest possible total cost of electricity, these plants must operate continuously for 24 hours a day to maximize their utilization, thereby justifying the capital expenditure through high output.
Base load plants operate continuously with high load factors (typically 60-90%).
Nuclear and coal-fired plants are typical base load providers.
Peak load plants (e.g., Gas turbines, Pumped Storage) have low investment but high operating costs.
The primary goal is to minimize the total Cost per kWh (Tariff).
Lower overall tariff for the consumer.
Better utilization of expensive capital equipment.
Requires stable, predictable load demand.
High initial barrier to entry.
Nuclear Power Plants
Large Coal-fired Thermal Plants
Run-of-River Hydroelectric Projects
| Feature | Base Load | Peak Load |
|---|---|---|
Cost Structure | High Initial, Low Operating | Low Initial, High Operating |
Base load plants cannot follow rapid load changes efficiently.
Peak load stations are designed for quick start-up and flexible output to handle the top portion of the load duration curve.
B is correct тАФ High capital intensive plants must operate at high load factors to minimize the fixed cost component per unit of energy generated.
Always relate the load profile to the power plant type: remember 'Base' needs 'Constant/High Load', 'Peak' needs 'Responsive/Flexible Output'.