In a load duration curve for an integrated power system the uppermost crest represents the energy contributed by
Base power stations
Major thermal stations
Peaking hydro or gas turbine stations
Non-conventional power stations
Peaking hydro or gas turbine stations
The uppermost crest of a load duration curve represents the peak load demand, which occurs for a very short duration. Because these peaks are transient and infrequent, they are economically and technically suited to be served by peaking stations such as hydro plants or gas turbines, which have fast start-up times but higher marginal operating costs.
The uppermost crest of a load duration curve represents the peak load demand, which occurs for a very short duration. Because these peaks are transient and infrequent, they are economically and technically suited to be served by peaking stations such as hydro plants or gas turbines, which have fast start-up times but higher marginal operating costs.
Load┬аFactor=PeakDemandAverageLoadтАЛ
In a power system, the load duration curve is plotted with load on the y-axis and time on the x-axis, arranged in descending order of magnitude. The base load (bottom portion) is served by efficient, high-capacity, slow-starting base load plants (nuclear, coal), while the peak load (top portion) requires units capable of rapid ramping and quick synchronization to handle fluctuating, short-term demand.
Load Duration Curve (LDC) shows the relationship between load and time duration for which the load is exceeded.
Base load plants operate at high capacity factors (>70%) with low variable costs.
Peaking plants operate at low capacity factors with fast response characteristics.
The area under the LDC represents the total energy (kWh) generated during the period.
Optimizes cost of electricity generation
Matches plant characteristics with load profiles
Requires high capital investment for multi-source generation
Complex grid management and dispatching
Economic scheduling of power plants
Planning of new power generation capacity
Base load plants: Coal, Nuclear, Run-of-river Hydro.
Peaking plants: Gas Turbines, Pumped Storage Hydro.
Option B (Major thermal) is incorrect because thermal plants usually handle base load due to slow starting characteristics.
C is correct тАФ The peak demand portion of a load duration curve is best handled by peaking hydro or gas turbine stations due to their rapid start-up and ramping capabilities.
Remember that the 'Capacity Factor' is the inverse indicator of plant suitability for peaking duty; peaking plants have low capacity factors.