In a power station, the cost of generation of power reduces most effectively when
Diversity factor alone increases
Both diversity factor and load factor increase
Load factor alone increases
Both diversity factor and load factor decrease
Both diversity factor and load factor increase
The cost of generation is minimized when both the diversity factor and the load factor are high. A high load factor reduces the capital cost per unit of energy by utilizing the plant capacity efficiently, while a high diversity factor allows a power station to serve a larger connected load with a smaller installed capacity.
The cost of generation is minimized when both the diversity factor and the load factor are high. A high load factor reduces the capital cost per unit of energy by utilizing the plant capacity efficiently, while a high diversity factor allows a power station to serve a larger connected load with a smaller installed capacity.
LF=Max┬аDemandAverage┬аDemandтАЛ тАФ Load Factor calculation
DF=Station┬аPeak┬аDemandтИСIndividual┬аMax┬аDemandsтАЛ тАФ Diversity Factor calculation
The total cost of generation consists of fixed costs (dependent on installed capacity) and operating costs (dependent on energy generated). The load factor is LF=Maximum┬аDemandAverage┬аDemandтАЛ, where increasing it ensures the plant runs closer to its full potential, spreading fixed costs over more units. The diversity factor is DF=Station┬аPeak┬аDemandтИСIndividual┬аMax┬аDemandsтАЛ; a higher diversity factor means the total peak demand on the station is lower than the sum of individual loads, reducing the required plant capacity.
High Load Factor implies efficient utilization of capital equipment.
High Diversity Factor indicates that the aggregate demand is flatter and peaks are non-coincident.
Fixed costs are inversely proportional to the load factor.
A lower Station Peak Demand allows for a smaller generation plant, reducing capital investment.
Improved Return on Investment (ROI)
Reduced energy wastage
Better equipment life cycle due to stable loading
Difficult to control diversity in uncontrolled consumer loads
Requires grid-level demand side management
Base Load Power Stations
Grid Capacity Planning
Tariff Design
Diversity factor is always greater than 1 in practice for power stations.
Load factor is always less than or equal to 1.
If diversity factor decreases, the station peak demand increases, requiring more installed capacity which increases capital expenditure.
B is correct тАФ Both a higher load factor and a higher diversity factor effectively minimize the fixed and operating costs per unit of electrical energy generated.
Always remember that 'Load Factor' relates to time-based usage (Energy), while 'Diversity Factor' relates to the spatial or demographic distribution of peak loads (Capacity).