Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

In breakdown maintenance which activities performed?

A

Trouble shooting

B

Replacement of parts

C

Locating problems

D

All of these

Correct Answer

Concept & PrincipleElectricalPower System
Option D

All of these

Quick Summary: Breakdown maintenance, also known as corrective or reactive maintenance, is performed only after an equipment failure has occurred to restore it to its operating state. It encompasses the entire diagnostic and repair lifecycle, including identifying the fault, troubleshooting the root cause, and executing the necessary part replacements.

💡 Explanation

Breakdown maintenance, also known as corrective or reactive maintenance, is performed only after an equipment failure has occurred to restore it to its operating state. It encompasses the entire diagnostic and repair lifecycle, including identifying the fault, troubleshooting the root cause, and executing the necessary part replacements.

🔢 Key Formulas

MTTR=∑Repair TimesNumber of RepairsMTTR = \frac{\sum \text{Repair Times}}{\text{Number of Repairs}}MTTR=Number of Repairs∑Repair Times​ — Mean Time To Repair represents the average time to complete the breakdown maintenance cycle.

⚙️ Working Principle

The principle relies on 'Run-to-Failure' logic, where the system is operated until a functional cessation occurs. Upon breakdown, the process initiates: (1) Localization of the faulty subsystem or component; (2) Troubleshooting to isolate the specific defect (e.g., electrical short, mechanical wear); (3) Execution of corrective actions including repairing or replacing components to restore service.

📌 Key Points
  • ▸

    Breakdown maintenance is a reactive strategy, not a proactive one.

  • ▸

    It is cost-effective for non-critical, low-cost items where downtime is not expensive.

  • ▸

    Reliability index is typically lower compared to Preventive Maintenance (PM).

  • ▸

    Requires ready availability of spare parts to minimize downtime.

✅ Advantages
  • ▸

    Lower initial investment in monitoring equipment

  • ▸

    No requirement for complex maintenance scheduling

❌ Disadvantages / Limitations
  • ▸

    Unpredictable downtime leading to production loss

  • ▸

    Potential for secondary damage if components fail catastrophically

🛠️ Applications / Uses
  • ▸

    Domestic electrical appliances (e.g., light bulbs, switches)

  • ▸

    Non-critical auxiliary plant equipment

📄 Additional Information
  • ▸

    This approach is often denoted as Corrective Maintenance in industrial standards.

  • ▸

    Option A, B, and C are all sub-processes of the corrective cycle, making D the correct choice.

📊 Diagram / Illustration
Breakdown Maintenance ProcessFault OccursTroubleshootPart ReplaceRestoration of Equipment Operation
✅

D is correct — Breakdown maintenance covers all aspects of failure response, including identifying, analyzing, and resolving the fault to restore machine functionality.

Core Concepts Used
Click any tag to open in AI Tutor
Reactive Maintenance Fault Diagnosis Corrective Action
💡 EXAM TIP

In competitive exams, remember that while Preventive Maintenance reduces failure risk, Breakdown Maintenance is the baseline 'default' state; always categorize maintenance types based on whether they occur before or after failure.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______