Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Which Factor to be considered while preparing maintenance schedule?

A

Type of machine

B

Accessories of the equipment

C

Cost of stand by unit

D

All of these

Correct Answer

Concept & PrincipleElectricalPower System
Option D

All of these

Quick Summary: A comprehensive maintenance schedule is designed by integrating technical, operational, and economic parameters to maximize equipment reliability. It ensures that the machine state, associated accessories, and financial impact of downtime are balanced to optimize total lifecycle costs.

💡 Explanation

A comprehensive maintenance schedule is designed by integrating technical, operational, and economic parameters to maximize equipment reliability. It ensures that the machine state, associated accessories, and financial impact of downtime are balanced to optimize total lifecycle costs.

🔢 Key Formulas

TotalCost=Cscheduled+(Pfail×Cunplanned)Total Cost = C_{scheduled} + (P_{fail} \times C_{unplanned})TotalCost=Cscheduled​+(Pfail​×Cunplanned​) — Economic objective function where PfailP_{fail}Pfail​ is the probability of failure

MTBF=1λMTBF = \frac{1}{\lambda}MTBF=λ1​ — Mean Time Between Failures, used to determine interval frequency

⚙️ Working Principle

Maintenance scheduling follows the principle of Reliability Centered Maintenance (RCM). The process requires: 1. Machine Analysis: Understanding duty cycles and failure modes. 2. Dependency Analysis: Checking inter-connected accessories. 3. Economic Analysis: Evaluating the cost of downtime versus the cost of standby units (e.g., Costmaintenance+Costdowntime<CostfailureCost_{maintenance} + Cost_{downtime} < Cost_{failure}Costmaintenance​+Costdowntime​<Costfailure​).

📌 Key Points
  • ▸

    Preventive maintenance minimizes unscheduled downtime.

  • ▸

    The criticality of the equipment dictates the frequency of inspection.

  • ▸

    Maintenance schedules must align with the manufacturer's technical manuals.

  • ▸

    Cost-benefit analysis of standby units determines if redundant systems justify lower maintenance priority.

✅ Advantages
  • ▸

    Reduction in sudden equipment breakdown

  • ▸

    Extended asset service life

  • ▸

    Enhanced worker safety

❌ Disadvantages / Limitations
  • ▸

    High initial planning and administrative overhead

  • ▸

    Potential for over-maintenance leading to unnecessary costs

🛠️ Applications / Uses
  • ▸

    Power Transformers and Switchgears

  • ▸

    Rotating electrical machinery (Motors and Generators)

  • ▸

    Industrial automation lines

📄 Additional Information
  • ▸

    A, B, and C are all individual components that collectively dictate the maintenance philosophy.

  • ▸

    A schedule is only 'optimal' if it considers both the technical requirements of the hardware (machine type/accessories) and the economic impact of the shutdown (standby availability).

📊 Diagram / Illustration
Maintenance Scheduling FactorsType of MachineAccessoriesStandby CostOptimal Maintenance Schedule
✅

D is correct — A maintenance schedule must comprehensively evaluate machine characteristics, auxiliary dependencies, and the financial implications of standby unit availability to achieve operational efficiency.

Core Concepts Used
Click any tag to open in AI Tutor
Preventive Maintenance Reliability Centered Maintenance (RCM) Operational Cost Optimization
💡 EXAM TIP

In competitive exams, 'All of these' is often the correct choice in maintenance management questions, as scheduling is a multi-dimensional optimization problem.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext