Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Which is not a part of preventive maintenance

A

Routine maintenance

B

Periodic maintenance

C

Overhaul

D

None of above

Correct Answer

Concept & PrincipleElectricalPower System
Option D

None of above

Quick Summary: Preventive maintenance is a proactive strategy focused on maintaining equipment in satisfactory operating condition by providing for systematic inspection, detection, and correction of incipient failures before they occur. Routine maintenance, periodic maintenance, and overhauling are all essential constituents of a structured preventive maintenance program designed to ensure system reliability and longevity.

💡 Explanation

Preventive maintenance is a proactive strategy focused on maintaining equipment in satisfactory operating condition by providing for systematic inspection, detection, and correction of incipient failures before they occur. Routine maintenance, periodic maintenance, and overhauling are all essential constituents of a structured preventive maintenance program designed to ensure system reliability and longevity.

🔢 Key Formulas

MTBF=1λMTBF = \frac{1}{\lambda}MTBF=λ1​ — Mean Time Between Failures, where λ\lambdaλ is the failure rate.

Availability=MTBFMTBF+MTTRAvailability = \frac{MTBF}{MTBF + MTTR}Availability=MTBF+MTTRMTBF​ — Probability that a system is operating at a given time.

⚙️ Working Principle

The principle relies on the 'bathtub curve' of equipment failure, where interventions are scheduled based on time, usage, or condition-based triggers. By performing inspections and minor repairs (Routine/Periodic) or major component renewal (Overhaul) at predefined intervals, the probability of random, catastrophic failure is minimized.

📌 Key Points
  • ▸

    Routine maintenance involves daily or weekly checks like lubrication and cleaning.

  • ▸

    Periodic maintenance is performed at set intervals (e.g., monthly) based on manufacturer guidelines.

  • ▸

    Overhaul involves partial or complete disassembly to restore equipment to 'as-new' condition.

  • ▸

    Preventive maintenance aims to increase the Mean Time Between Failures (MTBF).

✅ Advantages
  • ▸

    Reduces the risk of unexpected downtime.

  • ▸

    Extends the operational lifespan of electrical equipment.

❌ Disadvantages / Limitations
  • ▸

    High initial labor and documentation costs.

  • ▸

    Risk of 'over-maintenance' leading to unnecessary wear during disassembly.

🛠️ Applications / Uses
  • ▸

    Power Transformers maintenance.

  • ▸

    Circuit Breaker contact inspection.

  • ▸

    Switchgear routine insulation testing.

📄 Additional Information
  • ▸

    Preventive maintenance is distinct from 'Breakdown' or 'Corrective' maintenance, which occurs after a fault.

  • ▸

    All three listed options are legitimate categories within the preventive maintenance framework.

📊 Diagram / Illustration
Preventive Maintenance HierarchyPreventive MaintenanceRoutine Maint.Periodic Maint.Overhaul
✅

D is correct — Since routine, periodic, and overhaul procedures are all standard components of a preventive maintenance schedule, none of the options listed are excluded.

Core Concepts Used
Click any tag to open in AI Tutor
Maintenance Planning Reliability Centered Maintenance Asset Life Cycle Management
💡 EXAM TIP

In exams, remember that 'Preventive' is proactive (time/condition-based), while 'Corrective' is reactive (failure-based).

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext