Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Testing and recording activity is cover under which maintenance?

A

Preventive maintenance

B

Predictive maintenance

C

Breakdown maintenance

D

All of these

Correct Answer

Concept & PrincipleElectricalPower System
Option A

Preventive maintenance

Quick Summary: Preventive maintenance is a proactive strategy that involves the periodic inspection, testing, and recording of equipment performance to detect potential faults before they lead to failure. Recording these activities ensures a historical trend analysis, which is essential for determining the remaining useful life of electrical assets.

💡 Explanation

Preventive maintenance is a proactive strategy that involves the periodic inspection, testing, and recording of equipment performance to detect potential faults before they lead to failure. Recording these activities ensures a historical trend analysis, which is essential for determining the remaining useful life of electrical assets.

🔢 Key Formulas

MTBF=Total Operating TimeNumber of FailuresMTBF = \frac{\text{Total Operating Time}}{\text{Number of Failures}}MTBF=Number of FailuresTotal Operating Time​ — Mean Time Between Failures, used to schedule intervals

Availability=MTBFMTBF+MTTRAvailability = \frac{MTBF}{MTBF + MTTR}Availability=MTBF+MTTRMTBF​ — Used to evaluate effectiveness of maintenance

⚙️ Working Principle

The principle relies on the 'Time-Based' or 'Condition-Based' scheduling of maintenance tasks. By systematically documenting parameters like insulation resistance, contact resistance, and oil quality, engineers can compare real-time data against baseline values. When recorded data shows a deviation, corrective action is scheduled, thereby minimizing the probability of unscheduled downtime.

📌 Key Points
  • ▸

    Preventive maintenance follows a predefined schedule based on time or operating hours.

  • ▸

    Data recording allows for trend analysis, helping in the identification of degradation patterns.

  • ▸

    It significantly reduces the 'Breakdown' risk compared to reactive approaches.

  • ▸

    Compliance with IS/IEC standards often mandates detailed maintenance logs.

✅ Advantages
  • ▸

    Increased reliability and uptime of power systems.

  • ▸

    Cost-effective by preventing catastrophic equipment failure.

  • ▸

    Enhanced safety for operating personnel.

❌ Disadvantages / Limitations
  • ▸

    Higher initial labor costs compared to run-to-failure methods.

  • ▸

    Risk of 'over-maintenance' if intervals are too frequent.

  • ▸

    Possibility of inducing human error during unnecessary intrusive testing.

🛠️ Applications / Uses
  • ▸

    Power Transformers (Insulation monitoring)

  • ▸

    Circuit Breakers (Contact timing/testing)

  • ▸

    Switchgear and Busbar systems

📄 Additional Information
  • ▸

    Breakdown maintenance is purely reactive and performed only after a failure occurs.

  • ▸

    Predictive maintenance uses condition monitoring (like thermography or oil analysis) to anticipate failure, whereas preventive is largely interval-based.

  • ▸

    Recording activities are usually documented in a 'Maintenance Log Book' or a CMMS (Computerized Maintenance Management System).

📊 Diagram / Illustration
Preventive Maintenance CycleInspection & TestingRecording & AnalysisPredictive Action
✅

A is correct — Testing and recording activities are fundamental components of preventive maintenance performed on a schedule to ensure reliability.

Core Concepts Used
Click any tag to open in AI Tutor
Condition-based monitoring Reliability Centered Maintenance (RCM) Asset lifecycle management
💡 EXAM TIP

In competitive exams, remember that 'Testing and Recording' is synonymous with 'Planned' or 'Preventive' maintenance, whereas 'Monitoring while running' is characteristic of 'Predictive' maintenance.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext