Load duration curve for unity load factor will be of
Rectangular shape
Triangular shape
L shape
I shape
Rectangular shape
A Load Duration Curve (LDC) represents the variation of load over a specific period, arranged in descending order of magnitude. When the load factor is unity, the average load equals the maximum demand, meaning the power demand remains constant throughout the entire time period.
A Load Duration Curve (LDC) represents the variation of load over a specific period, arranged in descending order of magnitude. When the load factor is unity, the average load equals the maximum demand, meaning the power demand remains constant throughout the entire time period.
LoadFactor=MaximumDemandAverageLoadтАЛ тАФ The ratio expressing utilization efficiency.
EnergyGenerated=AverageLoad├ЧTime тАФ The total energy produced over the duration.
The Load Factor is defined as the ratio of average load to maximum demand. If the Load Factor is 1.0 (unity), it implies that AverageLoad=MaximumDemand. Consequently, the graphical representation of power demand versus time becomes a horizontal line, resulting in a rectangular shape when plotted against time duration.
Unity load factor indicates a perfectly constant demand.
The area under the Load Duration Curve represents total energy consumed.
For unity load factor, the base load and peak load are identical.
In practical power systems, load factor is always less than unity due to load variations.
Optimal utilization of generation equipment.
Lower per-unit cost of electricity generation.
Real-world consumer patterns are stochastic and non-linear.
Difficult to maintain unity load factor without energy storage or demand-side management.
Base load power plant planning.
Grid stability analysis.
Economic dispatch studies.
A load factor of 1 is the theoretical maximum, representing ideal constant power consumption.
Option B (Triangular) represents a strictly linear increase/decrease in load, which is not constant.
A is correct тАФ For a unity load factor, the load remains constant over the entire duration, creating a rectangle when plotted against time.
In competitive exams, remember that a 'Unity Load Factor' signifies a 'Flat' load profile, which is the most desirable state for power system efficiency and stability.