Load duration curve gives
Variation of load during different hours of the day
Average load
Number of hours for which a particular load lasts during the day
None of above
Number of hours for which a particular load lasts during the day
A Load Duration Curve (LDC) represents the relationship between the magnitude of electrical load and the duration for which that load occurs over a specific time period. It is constructed by arranging the load values in descending order of magnitude, effectively showing how many hours a particular load level is met or exceeded.
A Load Duration Curve (LDC) represents the relationship between the magnitude of electrical load and the duration for which that load occurs over a specific time period. It is constructed by arranging the load values in descending order of magnitude, effectively showing how many hours a particular load level is met or exceeded.
Load┬аFactor=Peak┬аLoadAverage┬аLoadтАЛ
Total┬аEnergy┬а(kWh)=тИл0TтАЛP(t)dt
The LDC is derived by taking the Chronological Load Curve (which tracks power vs. time) and rearranging the data points in order of decreasing magnitude. On the X-axis, we plot the cumulative time duration, while the Y-axis represents the load in megawatts (MW). This transformation allows utility engineers to determine the capacity requirements for base load and peak load plants efficiently.
The area under the LDC represents the total energy consumed during the period.
The highest point on the curve indicates the Peak Load of the system.
LDC is independent of the sequence of load occurrence throughout the day.
Used extensively for selection of generator capacity and merit order operation.
Provides a clear view of the duration for which a specific power level is required.
Simplifies the determination of energy generation requirements.
Useful for comparing different types of generating units (base vs. peak load).
Does not reveal the exact time of day when a specific load occurs.
Cannot be used to study the sequence of load switching.
Planning of electrical power generation capacity.
Determining the most economic mix of generating equipment.
Option A refers to the Chronological Load Curve.
Option B refers to the Load Factor calculation component, not the curve definition itself.
C is correct тАФ The load duration curve plots the load values in descending order against the time duration for which those loads are sustained.
Always remember: Chronological Load Curve is for TIME sequence; Load Duration Curve is for MAGNITUDE duration.