Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
ЁЯЫТ0
рдЕA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
┬й 2026 Examoogle. India's #1 competitive exam AI tutor.
ЁЯФТ SSL SecuredЁЯУ▒ UPI AcceptedЁЯз╛ GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
SubtotalтВ╣0
TotalтВ╣0
Examoogle тАв User тАв info@examoogle.com тАв EE-2024-8821
Chapter 1 of 12 тАв Page 1 of 248ЁЯФТ Protected PDF тАв Watermarked
Back to Practice Questions
ElectricalEconomics for Engineers
PrevNext

Normally Supply voltage is applied on ___________ side during Open Circuit test on the transformer.

A

LV

B

HV

C

Both side (one by one)

D

All of these

Correct Answer

тЪЩя╕П TE тАв Technical Concept & PrincipleElectricalEconomics for Engineers
Option A

LV

Quick Summary:

In an Open Circuit (OC) test, the rated supply voltage is applied to the Low Voltage (LV) winding while the High Voltage (HV) winding is kept open-circuited. This is done primarily for safety reasons and to ensure that the measuring instruments (voltmeter and wattmeter) can operate within their standard voltage ranges.

тЪЩя╕ПTETechnical SolutionConcept & Principle
ЁЯТб Explanation

In an Open Circuit (OC) test, the rated supply voltage is applied to the Low Voltage (LV) winding while the High Voltage (HV) winding is kept open-circuited. This is done primarily for safety reasons and to ensure that the measuring instruments (voltmeter and wattmeter) can operate within their standard voltage ranges.

ЁЯФв Key Formulas

Poc=VlvI0cosтБб╧Х0P_{oc} = V_{lv} I_0 \cos\phi_0PocтАЛ=VlvтАЛI0тАЛcos╧Х0тАЛ тАФ Power measured represents core losses

R0=Vlv2PocR_0 = \frac{V_{lv}^2}{P_{oc}}R0тАЛ=PocтАЛVlv2тАЛтАЛ тАФ Shunt branch resistance

X0=VlvImX_0 = \frac{V_{lv}}{I_m}X0тАЛ=ImтАЛVlvтАЛтАЛ тАФ Magnetizing reactance

тЪЩя╕П Working Principle

The primary objective of the OC test is to determine the core losses (hysteresis and eddy current losses) and the shunt branch parameters of the transformer equivalent circuit. Since the secondary is open, no load current flows, and the primary current represents only the no-load (exciting) current, which is very small (typically 2-5% of rated current). Applying voltage to the LV side allows using standard laboratory equipment without requiring expensive high-voltage rated instruments.

ЁЯУМ Key Points
  • тЦ╕

    The OC test is conducted at rated voltage and rated frequency.

  • тЦ╕

    The LV side is used to match standard low-voltage instrumentation.

  • тЦ╕

    Core losses are practically constant regardless of the load.

  • тЦ╕

    The secondary current is zero, so I2RI^2RI2R copper loss is neglected.

тЬЕ Advantages
  • тЦ╕

    Safe for laboratory personnel

  • тЦ╕

    Uses standard low-range equipment

  • тЦ╕

    Directly identifies core loss parameters

тЭМ Disadvantages / Limitations
  • тЦ╕

    Cannot determine full-load copper losses

  • тЦ╕

    Requires stable frequency supply

ЁЯЫая╕П Applications / Uses
  • тЦ╕

    Transformer efficiency calculation

  • тЦ╕

    Determination of no-load power factor

  • тЦ╕

    Verification of core design

ЁЯУД Additional Information
  • тЦ╕

    HV side is kept open to avoid high voltages that would require expensive and potentially dangerous test equipment.

  • тЦ╕

    Option B is incorrect because applying rated voltage to the HV side would require a high-voltage variable supply and high-voltage measuring instruments, which is impractical.

  • тЦ╕

    The transformer core is excited by the rated flux, ensuring the core loss measured is the actual operating core loss.

ЁЯУК Diagram / Illustration
Transformer Open Circuit Test SetupSupply SourceTransformerLV SideHV Side (Open)
тЬЕ

A is correct тАФ The Open Circuit test is performed on the LV side to utilize rated voltage safely using standard laboratory instruments.

Core Concepts Used
Click any tag to open in AI Tutor
Transformer Testing Core Losses Excitation Current
ЁЯТб EXAM TIP

Always remember: OC test for Core Loss (LV side), SC test for Copper Loss (HV side).

Related Questions

ElectricalEconomics for Engineers
Wha is the indication of the second digit in IP code?
ElectricalEconomics for Engineers
Wha is the indication of the first digit in IP code?
ElectricalEconomics for Engineers
The designation used for the _____________ consists of the letters IP followed by two characteristic numerals signifying conformity with the condition
ElectricalEconomics for Engineers
What is IP code in rotating machine?
ElectricalEconomics for Engineers
In which of the following enclosure, we can not stop water from entering into the machine?

Discussion (0)