Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Replacement of worn out part can done during ___________

A

Routine maintenance

B

Breakdown maintenance

C

Periodic maintenance

D

Preventive maintenance

Correct Answer

Concept & PrincipleElectricalPower System
Option B

Breakdown maintenance

Quick Summary: Breakdown maintenance is a reactive strategy where equipment is repaired or parts are replaced only after a failure or functional breakdown has occurred. In this approach, no intervention is planned prior to the fault, and the equipment is run until it ceases to operate correctly.

💡 Explanation

Breakdown maintenance is a reactive strategy where equipment is repaired or parts are replaced only after a failure or functional breakdown has occurred. In this approach, no intervention is planned prior to the fault, and the equipment is run until it ceases to operate correctly.

🔢 Key Formulas

MTTR=Total Maintenance TimeNumber of RepairsMTTR = \frac{\text{Total Maintenance Time}}{\text{Number of Repairs}}MTTR=Number of RepairsTotal Maintenance Time​ — Represents the mean time to repair after a breakdown.

⚙️ Working Principle

The principle relies on the 'run-to-failure' logic. Maintenance is triggered exclusively by an unplanned stoppage, necessitating the diagnostic identification of a worn-out component, its removal, and subsequent replacement to restore the system to its operational state.

📌 Key Points
  • ▸

    Also known as 'Corrective Maintenance'.

  • ▸

    High risk of cascading failures due to sudden stops.

  • ▸

    Appropriate for non-critical assets where repair cost is lower than planned maintenance.

  • ▸

    Usually involves higher emergency labor costs compared to scheduled tasks.

✅ Advantages
  • ▸

    No upfront planning or inspection costs.

  • ▸

    Reduces immediate maintenance budget overhead.

❌ Disadvantages / Limitations
  • ▸

    Unpredictable downtime impacting production.

  • ▸

    Potential for severe secondary damage to healthy parts.

  • ▸

    High overtime labor costs for emergency repairs.

🛠️ Applications / Uses
  • ▸

    Lighting fixtures in non-critical areas.

  • ▸

    Low-cost, easily replaceable components.

  • ▸

    Single-unit equipment with redundancy.

🔄 Comparison Table
FeatureBreakdown Maint.Preventive Maint.

Intervention timing

After failure

Before failure

📄 Additional Information
  • ▸

    Routine maintenance is a regular service interval (e.g., lubrication).

  • ▸

    Periodic maintenance is a time-based task, usually preventive.

  • ▸

    Preventive maintenance involves scheduled inspections to avoid breakdowns.

📊 Diagram / Illustration
Breakdown Maintenance CycleNormal OperationComponent Failure / Breakdown
✅

B is correct — Replacement of worn-out parts in a 'run-to-failure' strategy occurs during Breakdown maintenance.

Core Concepts Used
Click any tag to open in AI Tutor
Reactive Maintenance Asset Life Cycle Unplanned Downtime
💡 EXAM TIP

In competitive exams, distinguish 'Preventive' (scheduled based on time/usage) from 'Breakdown' (event-driven). If the question implies 'fixing a fault that already occurred', it is always Breakdown maintenance.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext