48 men can do a work in 5 days while 40 women can do the same work in 9 days. In how many days can 4 men and 6 women together do the same work?
24 days
30 days
48 days
42 days
30 days
Convert the working capacity of men and women into a common unit (e.g., total man-days or woman-days) and equate the total work to find the combined efficiency.
48 men can do a work in 5 days, 40 women can do the same work in 9 days. We need to find the days required for 4 men and 6 women working together.
Total┬аWork=M1тАЛ├ЧD1тАЛ=W1тАЛ├ЧD2тАЛ
Convert the working capacity of men and women into a common unit (e.g., total man-days or woman-days) and equate the total work to find the combined efficiency.
Adding the number of men and women directly without converting them to an equivalent single workforce efficiency.
Step 1: Find the efficiency ratio of men to women
Since 48 men working for 5 days can do the same work as 40 women working for 9 days, we can equate the total work: 48├Ч5├ЧM=40├Ч9├ЧW
240M=360WтЯ╣WMтАЛ=23тАЛ
Step 2: Calculate Total Work in terms of Men
Using the men's work capacity, Total Work = 48┬аmen├Ч5┬аdays=240┬аman-days.
Total┬аWork=240┬аunits
Step 3: Calculate the efficiency of the combined group
We need 4 men and 6 women. Since M=3 and W=2, substitute these values to find their combined one-day work:
4M+6W=4(3)+6(2)=12+12=24┬аunits/day
Step 4: Find the total number of days required
Divide the total work by the combined daily work of 4 men and 6 women:
Days=24240тАЛ=10┬аdays
B is correct because 4 men and 6 women together can complete the work in 30 days... Wait, let's re-verify the calculations: 4M + 6W = 4(3) + 6(2) = 24. Total work = 48 * 5 = 240. Days = 240 / 24 = 10. Let's check option B: 30 days? Wait, let's re-read the options and calculation carefully. 48 men * 5 days = 240 man-days. 40 women * 9 days = 360 woman-days. 240 M = 360 W => 2M = 3W. Let's re-evaluate: 48 * 5 = 240, 40 * 9 = 360. 240 / 120 = 2, 360 / 120 = 3 => 2M = 3W. Then for 4 men and 6 women: 4 men = 4 * (3/2)W = 6W, so 4M + 6W = 6W + 6W = 12W. Total work in woman-days = 40 * 9 = 360 woman-days. Days = 360 / 12 = 30 days!
This concept of efficiency equivalence is widely used in pipes and cisterns problems as well as proportion-based arithmetic.