The area under daily load curve divided by 24 hours gives
Average load of the day
Maximum demand
Connected load
Demand factor
Average load of the day
The daily load curve represents the variation of power demand over a 24-hour period. By integrating this curve, we obtain the total energy consumption (in MWh or kWh) for the day, and dividing this area by 24 hours yields the average power demand over that duration.
The daily load curve represents the variation of power demand over a 24-hour period. By integrating this curve, we obtain the total energy consumption (in MWh or kWh) for the day, and dividing this area by 24 hours yields the average power demand over that duration.
PavgтАЛ=24тИл024тАЛP(t)dtтАЛ тАФ average load calculation
LF=PmaxтАЛPavgтАЛтАЛ тАФ load factor formula
The daily load curve plots load (in MW or kW) against time (in hours). Mathematically, the area under the curve is defined as тИл024тАЛP(t)dt. The average load is then calculated as the ratio of total energy generated to the total time duration, effectively smoothing out the peaks and valleys of the generation pattern.
The area under the daily load curve represents the total daily energy generation in kWh or MWh.
The average load is always less than or equal to the maximum demand.
A higher average load relative to peak demand indicates a higher load factor, which improves plant efficiency.
Helps in estimating fuel requirements for the day.
Assists in planning the commitment of generating units.
Does not account for peak surge durations.
Provides no information on the quality of supply.
Economic scheduling of power plants.
Determining the capacity utilization of a power station.
If the average load equals the maximum demand, the load factor is 1, implying a perfectly flat load curve.
Option B (Maximum demand) refers to the highest point on the curve, not the average.
Option C (Connected load) is the sum of all rated capacities of electrical equipment connected to the system, which is usually higher than the peak demand.
A is correct тАФ The average load of the day is defined as the total energy consumed (area under the daily load curve) divided by the total time in hours (24).
Always remember that the Load Factor is the ratio of Average Load to Maximum Demand. A high Load Factor indicates a more stable and efficient usage of generation equipment.