There is a limit beyond which it is not economical still further to improve the power factor in order to meet the increased demand on the generating station. The maximum value to which the power factor can be economically raised entirely depends upon
Cost of power factor correction equipment
Cost of generating plant
Relative cost of the generating plant and phase advancing plant
None of above
Relative cost of the generating plant and phase advancing plant
The economic limit for power factor improvement is reached when the marginal cost of the power factor correction equipment (such as capacitors or synchronous condensers) equals the marginal saving achieved by reducing the kVA demand on the generating plant. Consequently, the optimal power factor is determined by the ratio of the cost of installing and maintaining phase advancing equipment to the cost of the generating and distribution infrastructure.
The economic limit for power factor improvement is reached when the marginal cost of the power factor correction equipment (such as capacitors or synchronous condensers) equals the marginal saving achieved by reducing the kVA demand on the generating plant. Consequently, the optimal power factor is determined by the ratio of the cost of installing and maintaining phase advancing equipment to the cost of the generating and distribution infrastructure.
CosttotalтАЛ=CostplantтАЛ+CostcorrectionтАЛ тАФ total cost function for power system operation
cos╧ХoptтАЛтЙИ1тИТ(CgтАЛCpтАЛтАЛ)2тАЛ тАФ where CpтАЛ is unit cost of phase advancing and CgтАЛ is unit cost of generating capacity
As power factor is improved, the kVA demand on the system decreases, allowing the utility to release existing capacity. However, phase advancing equipment has an associated capital and maintenance cost. The net annual saving is represented by the reduction in fixed charges for the capacity saved minus the annual cost of the improvement equipment. The maximum economic benefit is found by minimizing the total annual cost, which depends directly on the relative investment costs of the plant vs. the equipment.
Power factor improvement increases the effective capacity of the generation and distribution system.
Beyond the economic limit, the cost of additional capacitive compensation exceeds the value of the released generating capacity.
The 'Most Economical Power Factor' typically lies between 0.9 and 0.95 lagging in industrial systems.
This calculation involves trade-offs between fixed charges (plant) and running/capital costs (correction).
Reduced I2R losses in the transmission and distribution network.
Improved voltage regulation throughout the power system.
Increased load-carrying capacity of existing infrastructure.
High initial investment for capacitive banks or synchronous compensators.
Risk of over-compensation leading to leading power factor and voltage rise during light loads.
Industrial power distribution grids.
Utility transmission substations for voltage stability.
Large manufacturing plants with high inductive loads (motors/transformers).
Option A and B are incomplete because they only consider one side of the economic trade-off.
The correct answer represents the equilibrium point between the utility's capital expenditure on generation and the user's expenditure on compensation.
C is correct тАФ The maximum economic power factor is determined by the relative costs of the generating capacity released and the investment required for the phase advancing equipment.
Always remember that economic power factor is never unity because the cost of reaching unity (1.0) power factor is infinite in terms of equipment sizing relative to marginal gain.