Thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW of remaining 12 hours. The plant capacity factor for this station is
75
67
A is correct because the plant capacity factor is 50%, which is the standard result derived from the average load of 7.5 MW divided by the installed capacity of 15 MW.
Installed capacity = 15 MW, Load 1 = 10 MW for 12 hours, Load 2 = 5 MW for 12 hours.
Plant┬аCapacity┬аFactor=MaxPossibleEnergyProducedActualEnergyProducedтАЛ=Installed┬аCapacityAverage┬аLoadтАЛ
Calculate Total Energy Produced
Energy produced in the first 12 hours is 10├Ч12=120 MWh. Energy produced in the remaining 12 hours is 5├Ч12=60 MWh. Total Energy = 120+60=180 MWh.
EtotalтАЛ=(10├Ч12)+(5├Ч12)=180┬аMWh
Calculate Average Load
The total duration is 24 hours. The average load is the total energy divided by the time.
PavgтАЛ=24180тАЛ=7.5┬аMW
Calculate Plant Capacity Factor
The plant capacity factor is the ratio of average load to the installed capacity of 15 MW.
PCF=157.5тАЛ=0.5=50%
A is correct because the plant capacity factor is 50%, which is the standard result derived from the average load of 7.5 MW divided by the installed capacity of 15 MW.
Always distinguish between Plant Capacity Factor (based on installed capacity) and Plant Load Factor (based on maximum demand).