Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
ЁЯЫТ0
рдЕA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
┬й 2026 Examoogle. India's #1 competitive exam AI tutor.
ЁЯФТ SSL SecuredЁЯУ▒ UPI AcceptedЁЯз╛ GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
SubtotalтВ╣0
TotalтВ╣0
Examoogle тАв User тАв info@examoogle.com тАв EE-2024-8821
Chapter 1 of 12 тАв Page 1 of 248ЁЯФТ Protected PDF тАв Watermarked
Back to Practice Questions
CivilWater Resources Management
PrevNext

Unit of intensity of rain fall is....

A

mm/hmm/hmm/h

B

lit/minlit/minlit/min

C

lit/daylit/daylit/day

D

none of these

Correct Answer

тЪЩя╕П TE тАв Technical Concept & PrincipleCivilWater Resources Management
Option A

mm/hmm/hmm/h

Quick Summary:

Intensity of rainfall is defined as the rate at which rain falls, expressed as the depth of water per unit time. The standard SI-derived unit used in hydrology is millimeters per hour (mm/h).

тЪЩя╕ПTETechnical SolutionConcept & Principle
ЁЯТб Explanation

Intensity of rainfall is defined as the rate at which rain falls, expressed as the depth of water per unit time. The standard SI-derived unit used in hydrology is millimeters per hour (mm/h).

ЁЯФв Key Formulas

i=Pti = \frac{P}{t}i=tPтАЛ тАФ where iii is intensity, PPP is precipitation depth, and ttt is duration

тЪЩя╕П Working Principle

Rainfall intensity (iii) is calculated by dividing the total depth of precipitation accumulated over a specific catchment area (PPP) by the duration of the storm (ttt). Mathematically, it represents the derivative of accumulated rainfall with respect to time (i=dPdti = \frac{dP}{dt}i=dtdPтАЛ). It is a critical parameter in the Rational Method for estimating peak runoff in urban drainage and watershed design.

ЁЯУМ Key Points
  • тЦ╕

    Rainfall intensity is a scalar measure of precipitation rate.

  • тЦ╕

    Used extensively in the Rational Formula: Q=1360CIAQ = \frac{1}{360} CIAQ=3601тАЛCIA.

  • тЦ╕

    Measured using self-recording rain gauges (tipping bucket or float type).

  • тЦ╕

    Units commonly used include mm/h, cm/h, or inches/h.

тЬЕ Advantages
  • тЦ╕

    Simplifies calculation of runoff volume in small catchments.

  • тЦ╕

    Essential for designing hydraulic structures like culverts and storm drains.

тЭМ Disadvantages / Limitations
  • тЦ╕

    Does not account for spatial variation over large areas.

  • тЦ╕

    Averaging over time can hide peak short-duration bursts.

ЁЯЫая╕П Applications / Uses
  • тЦ╕

    Urban drainage system design.

  • тЦ╕

    Flood forecasting and warning systems.

  • тЦ╕

    Soil erosion studies.

ЁЯУД Additional Information
  • тЦ╕

    The intensity is often represented on an Intensity-Duration-Frequency (IDF) curve.

  • тЦ╕

    Options B (lit/min) and C (lit/day) represent discharge (volume per time), not intensity (depth per time), making them dimensionally inconsistent for intensity measurement.

ЁЯУК Diagram / Illustration
Rainfall Intensity (iii)
Depth of Rainfall (mmmmmm)
Duration of Storm (hhh)
тЬЕ

A is correct тАФ The unit of intensity of rainfall is defined as depth per unit time, specifically mm/h.

Core Concepts Used
Click any tag to open in AI Tutor
Hydrological cycle Precipitation measurement Rational Method
ЁЯТб EXAM TIP

Always distinguish between 'Intensity' (Depth/Time) and 'Discharge' (Volume/Time). Intensity is depth-based, whereas discharge depends on the catchment area.

Related Questions

CivilWater Resources Management
Dicken's formula for finding discharge is
CivilWater Resources Management
Check dam's top width is find by
CivilWater Resources Management
Remedial measurment to minimise water losses are
CivilWater Resources Management
Point to be consider during site selection of check dam are..
CivilWater Resources Management
Method of rainwater harvestings are..

Discussion (0)

Loading discussion...
PrevNext