Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
ЁЯЫТ0
рдЕA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
┬й 2026 Examoogle. India's #1 competitive exam AI tutor.
ЁЯФТ SSL SecuredЁЯУ▒ UPI AcceptedЁЯз╛ GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
SubtotalтВ╣0
TotalтВ╣0
Examoogle тАв User тАв info@examoogle.com тАв EE-2024-8821
Chapter 1 of 12 тАв Page 1 of 248ЁЯФТ Protected PDF тАв Watermarked
Back to Practice Questions
CivilWater Resources Management
PrevNext

Which work is carried out under watershed treatment?

A

treatment of engineering structures

B

construction of check dam

C

both a & b

D

none of the above

Correct Answer

тЪЩя╕П TE тАв Technical Concept & PrincipleCivilWater Resources Management
Option C

both a & b

Quick Summary:

Watershed treatment involves a holistic approach to managing land and water resources within a defined hydrological unit. It encompasses both vegetative measures (to reduce soil erosion) and engineering structures (to regulate runoff and recharge groundwater).

тЪЩя╕ПTETechnical SolutionConcept & Principle
ЁЯТб Explanation

Watershed treatment involves a holistic approach to managing land and water resources within a defined hydrological unit. It encompasses both vegetative measures (to reduce soil erosion) and engineering structures (to regulate runoff and recharge groundwater).

ЁЯФв Key Formulas

Q=CтЛЕiтЛЕAQ = C \cdot i \cdot AQ=CтЛЕiтЛЕA тАФ Rational method for estimating peak runoff (QQQ) for watershed design, where CCC is runoff coefficient, iii is intensity, and AAA is area.

S=1VvelocityS = \frac{1}{V_{velocity}}S=VvelocityтАЛ1тАЛ тАФ Relationship where engineering structures aim to reduce runoff velocity to minimize soil displacement.

тЪЩя╕П Working Principle

The principle relies on 'ridge-to-valley' treatment. Engineering structures like check dams serve to reduce the velocity of runoff, trap sediments, and enhance the percolation of water into the subsurface layers, thereby increasing the water table level and controlling erosion.

ЁЯУМ Key Points
  • тЦ╕

    Watershed management aims to optimize the use of natural resources within a drainage basin.

  • тЦ╕

    Engineering interventions include check dams, gabion structures, and farm ponds.

  • тЦ╕

    Vegetative measures include afforestation, contour trenching, and mulching.

  • тЦ╕

    The primary goal is the conservation of water and soil to support sustainable agriculture.

тЬЕ Advantages
  • тЦ╕

    Increases groundwater recharge significantly.

  • тЦ╕

    Prevents topsoil erosion during monsoon seasons.

  • тЦ╕

    Provides sustainable water supply for irrigation.

тЭМ Disadvantages / Limitations
  • тЦ╕

    Requires high initial capital investment.

  • тЦ╕

    Demands periodic desilting and maintenance of check dams.

ЁЯЫая╕П Applications / Uses
  • тЦ╕

    Rainwater harvesting in semi-arid regions.

  • тЦ╕

    Soil conservation in hilly catchment areas.

  • тЦ╕

    Flood peak attenuation for small streams.

ЁЯУД Additional Information
  • тЦ╕

    A check dam is a small, temporary or permanent dam constructed across a swale, drainage ditch, or waterway to counteract erosion.

  • тЦ╕

    Treatment of engineering structures refers to the structural stabilization of the basin to prevent channel scouring.

ЁЯУК Diagram / Illustration
Watershed Treatment ComponentsEngineeringStructuresCheck DamsResult: Erosion Control &Recharge
тЬЕ

C is correct тАФ Watershed treatment encompasses both structural engineering interventions like check dams and overall site stabilization to manage runoff effectively.

Core Concepts Used
Click any tag to open in AI Tutor
Hydrological Unit Erosion Control Runoff Attenuation
ЁЯТб EXAM TIP

Always remember that watershed management combines civil engineering (structures) with biological/agronomic practices (afforestation) for total basin health.

Related Questions

CivilWater Resources Management
Dicken's formula for finding discharge is
CivilWater Resources Management
Check dam's top width is find by
CivilWater Resources Management
Remedial measurment to minimise water losses are
CivilWater Resources Management
Point to be consider during site selection of check dam are..
CivilWater Resources Management
Method of rainwater harvestings are..

Discussion (0)

Loading discussion...
PrevNext