Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Who issues the Permit to Work Certificate?

A

Officer in charge of operations

B

Chief officer

C

Electric inspector

D

Collector

Correct Answer

Concept & PrincipleElectricalPower System
Option A

Officer in charge of operations

Quick Summary: A Permit to Work (PTW) is a formal safety management system used to control hazardous work activities. The 'Officer in Charge of Operations' (often the Shift Charge Engineer or Site Manager) is the designated authority responsible for issuing, signing, and revoking this permit to ensure the safety of personnel during electrical maintenance or commissioning.

💡 Explanation

A Permit to Work (PTW) is a formal safety management system used to control hazardous work activities. The 'Officer in Charge of Operations' (often the Shift Charge Engineer or Site Manager) is the designated authority responsible for issuing, signing, and revoking this permit to ensure the safety of personnel during electrical maintenance or commissioning.

🔢 Key Formulas

Risktotal=P×SRisk_{total} = P \times SRisktotal​=P×S — where P is probability and S is severity, which the PTW aims to minimize.

⚙️ Working Principle

The PTW mechanism functions as a procedural barrier. Before any high-risk task begins, the authorizing officer verifies isolation, de-energization, and earthing status. Once the safety conditions are verified and documented, the officer issues the permit to the working team, ensuring clear accountability and defined safety protocols.

📌 Key Points
  • ▸

    PTW is mandatory for activities like working on live electrical circuits, confined space entry, or hot work.

  • ▸

    The issuer remains accountable for the safety conditions specified at the time of permit issuance.

  • ▸

    The receiver must return the permit once the work is completed or the permit expires.

  • ▸

    Isolation verification is a prerequisite to PTW issuance.

✅ Advantages
  • ▸

    Ensures systematic hazard identification and risk control.

  • ▸

    Provides a written audit trail of high-risk activities.

❌ Disadvantages / Limitations
  • ▸

    Can lead to administrative delays if the process is not streamlined.

  • ▸

    Requires significant training to avoid 'paperwork-only' compliance.

🛠️ Applications / Uses
  • ▸

    Power System Maintenance

  • ▸

    Commissioning of High Voltage Substations

  • ▸

    Transformer Oil Filtration

📄 Additional Information
  • ▸

    The Officer in Charge of Operations maintains authority over the switchgear configuration.

  • ▸

    Option B (Chief Officer) typically manages maritime operations. Options C and D represent regulatory or administrative bodies outside the immediate plant operational safety chain.

📊 Diagram / Illustration
PTW Workflow HierarchyOfficer in Charge (Issuer)Permit Issued (Receiver)
✅

A is correct — The officer in charge of operations is the primary authority responsible for verifying site safety conditions and authorizing a Permit to Work.

Core Concepts Used
Click any tag to open in AI Tutor
Industrial Safety Management Lockout-Tagout (LOTO) Operational Accountability
💡 EXAM TIP

Always remember that safety hierarchy in engineering places operational authority (those controlling energy flow) as the primary issuers of work permits.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext