Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

To whom is the Permit to Work Certificate issued?

A

Chief officer

B

Acting Officer

C

Electric inspector

D

Project manager

Correct Answer

Concept & PrincipleElectricalPower System
Option B

Acting Officer

Quick Summary: A Permit to Work (PTW) is a formal safety document issued to an Acting Officer or the person-in-charge of a specific task to ensure that hazardous work is performed under controlled and authorized conditions. It serves as a written record authorizing specific maintenance or installation activities, ensuring that all safety protocols, such as isolation and earthing, are verified before work begins.

💡 Explanation

A Permit to Work (PTW) is a formal safety document issued to an Acting Officer or the person-in-charge of a specific task to ensure that hazardous work is performed under controlled and authorized conditions. It serves as a written record authorizing specific maintenance or installation activities, ensuring that all safety protocols, such as isolation and earthing, are verified before work begins.

🔢 Key Formulas

SafetyLevel=PermitComplianceRiskFactorSafety_{Level} = \frac{Permit_{Compliance}}{Risk_{Factor}}SafetyLevel​=RiskFactor​PermitCompliance​​ — conceptual representation of safety efficacy.

⚙️ Working Principle

The PTW system acts as a procedural barrier between hazard and human. The system mandates a sequence: 1) Risk Assessment, 2) Isolation of Energy Sources (Lockout/Tagout), 3) Verification of safety state by an authorized supervisor, 4) Issuance of the permit to the 'Acting Officer' or site personnel, and 5) Hand-back/Cancellation upon completion to re-energize.

📌 Key Points
  • ▸

    PTW is a legal requirement in industrial, marine, and power system maintenance.

  • ▸

    It specifies the exact nature of the work, the isolation points, and the required PPE.

  • ▸

    The 'Acting Officer' or 'Person in Charge' holds the responsibility for ensuring the site remains safe during the activity.

  • ▸

    Documentation must be signed both at the start and upon completion of the work.

✅ Advantages
  • ▸

    Prevents unauthorized entry into hazardous zones.

  • ▸

    Ensures all personnel are aware of current system state (e.g., de-energized).

❌ Disadvantages / Limitations
  • ▸

    Can be seen as bureaucratic if not implemented efficiently.

  • ▸

    Risk of complacency if 'paper-pushing' replaces genuine safety checks.

🛠️ Applications / Uses
  • ▸

    High Voltage Electrical Maintenance.

  • ▸

    Confined space entry.

  • ▸

    Work involving flammable substances or fire hazards.

📄 Additional Information
  • ▸

    The Chief Officer typically authorizes the permit, while the Acting Officer receives it to execute the task.

  • ▸

    Electric inspectors are regulatory bodies; they do not typically carry out maintenance permits themselves.

  • ▸

    Standard procedure follows the International Safety Management (ISM) code and local industrial regulations.

📊 Diagram / Illustration
Permit to Work FlowAuthorized SupervisorIssued to: Acting OfficerExecution of Task
✅

B is correct — The Permit to Work is issued to the Acting Officer to authorize and control specific high-risk maintenance or installation activities.

Core Concepts Used
Click any tag to open in AI Tutor
Occupational Health and Safety (OHS) Hazardous Area Management Isolation and Tagout procedures
💡 EXAM TIP

In competitive exams, remember that PTW is a management tool for 'Control of Work'; it is never issued to regulatory bodies like inspectors, but to those directly executing the maintenance.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______

Discussion (0)

Loading discussion...
PrevNext