A region has a maximum demand of 500 MW at a load factor of 50%. The load duration curve can be assumed to be a triangular.Utility has to meet this load by setting up a generating system which has partly hydro and partly thermal. The costs are as under.
Hydro plant: Rs.600 per kW per annum plus 3p per kWhThermal plant: Rs.300 per kW per annum plus 13p per kWh
The respective capacity of hydro and thermal power plants for minimum cost are
330 MW and 170 MW
170 MW and 330 MW
93.75 MW and 406.25 MW
406.25 MW and 93.75 MW
330 MW and 170 MW
To determine the optimal capacity mix, we equate the incremental costs of the hydro and thermal plants at a specific load duration duration. Since the cost of hydro is lower in operation but higher in capital, it is used for base load, while thermal is used for peak load based on the intersection point of the annual cost curves.
To determine the optimal capacity mix, we equate the incremental costs of the hydro and thermal plants at a specific load duration duration. Since the cost of hydro is lower in operation but higher in capital, it is used for base load, while thermal is used for peak load based on the intersection point of the annual cost curves.
Total┬аCost=(AnnualFixedCost├ЧkW)+(AnnualOperatingCost├ЧkWh)
t=8760├Ч(1тИТPmaxтАЛPтАЛ)
The total annual cost is given by C=(FixedCost├ЧCapacity)+(VariableCost├ЧEnergy). For a triangular load duration curve, the duration t (in hours per annum) corresponding to a load P is given by t=T(1тИТP/PmaxтАЛ), where T=8760. By setting the incremental cost of the thermal plant equal to the hydro plant, we find the critical load point that defines the capacity demarcation between the two units.
Hydro plants generally have high initial capital costs and low operating costs, making them suitable for base load.
Thermal plants have lower initial capital costs but higher fuel costs, making them suitable for peak loads.
The triangular load duration curve implies that the peak load is at zero duration and the minimum load is at full year duration.
Optimal cost distribution
Balanced utilization of plant resources
Requires precise load forecasting
Dependency on seasonal water availability for hydro
Grid integration of multi-source power systems
Economic scheduling in utility planning
The calculation involves solving: 600+(0.03├Чt)=300+(0.13├Чt), where t=8760├Ч(1тИТP/500).
Solving for P yields 330 MW as the hydro capacity, leaving 170 MW for the thermal peak-shaving unit.
A is correct тАФ The optimal capacity split is 330 MW for the hydro plant and 170 MW for the thermal plant to minimize total annual costs.
Always verify if the given costs are in Rs/kW/annum or Rs/kW/month; discrepancies here are a common source of error in competitive exam calculations.