In a power station, the cost of generation of power reduces most effectively when
Diversity factor alone increases
Both diversity factor and load increases
Load factor alone increases
Both diversity factor and load factor decreases
Both diversity factor and load increases
The cost of power generation decreases effectively when both the diversity factor and load factor are high. A high load factor ensures that the plant capacity is utilized more consistently, while a high diversity factor indicates that individual peak demands of consumers do not occur simultaneously, reducing the required total installed capacity.
The cost of power generation decreases effectively when both the diversity factor and load factor are high. A high load factor ensures that the plant capacity is utilized more consistently, while a high diversity factor indicates that individual peak demands of consumers do not occur simultaneously, reducing the required total installed capacity.
LF=Maximum┬аDemandAverage┬аLoadтАЛ тАФ Load factor represents the utilization of the plant capacity over time.
DF=Group┬аMax┬аDemandтИСIndividual┬аMax┬аDemandsтАЛ тАФ Diversity factor represents the non-coincidence of consumer loads.
The total cost of generation consists of fixed costs (capital investment) and variable costs (fuel, maintenance). A higher diversity factor reduces the 'Maximum Demand' on the station, lowering the capital investment per unit. A higher load factor reduces the 'Cost per unit generated' by spreading the fixed charges over a larger number of units (kWh) produced, thereby improving operational efficiency.
Load factor is always less than or equal to 1.
Diversity factor is always greater than 1.
Increasing load factor reduces the total cost per kWh by distributing fixed costs over more units.
Increasing diversity factor reduces the peak load, thereby reducing the required nameplate capacity of the power plant.
Improved plant efficiency
Reduction in capital cost per installed kW
Better utilization of assets
Managing high diversity often requires complex demand-side management
Extremely high load factor may lead to reduced maintenance windows
Grid planning and expansion
Tariff structure designing
Power system load management
A higher load factor implies that the plant is running closer to its maximum capacity for longer periods, which reduces the idle time cost.
Option A is insufficient because, while diversity factor reduces total capacity requirements, the load factor is critical for amortizing fixed costs over volume.
B is correct тАФ High diversity factor reduces installed capacity requirement, and high load factor reduces the fixed cost component per unit of energy generated.
Always remember that in competitive exams, 'cost reduction' in power systems is almost always synonymous with better utilization of existing infrastructure, linked directly to increasing load and diversity factors.