If A can do 1/3 of a work in 5 days and B can do 2/5 of the same work in 10 days, how long will they take to finish the work together?
7.5 ┬аdays
8.5 ┬аdays
9.5 ┬аdays
10 ┬аdays
7.5 ┬аdays
Calculate individual total time: A takes 5├Ч3=15 days, B takes 10├Ч25тАЛ=25 days. Use A+BA├ЧBтАЛ=15+2515├Ч25тАЛ=40375тАЛ=9.375. Wait, re-evaluating: A=15, B=25. 40375тАЛ=9.375. Actually, the question states A does 1/3 in 5 days (15 total) and B does 2/5 in 10 days (25 total).
A does 1/3 of the work in 5 days, B does 2/5 of the work in 10 days.
T=EAтАЛ+EBтАЛWтАЛ
Calculate individual total time: A takes 5├Ч3=15 days, B takes 10├Ч25тАЛ=25 days. Use A+BA├ЧBтАЛ=15+2515├Ч25тАЛ=40375тАЛ=9.375. Wait, re-evaluating: A=15, B=25. 40375тАЛ=9.375. Actually, the question states A does 1/3 in 5 days (15 total) and B does 2/5 in 10 days (25 total).
Students often assume B does the work in 10 days, forgetting to calculate the total time for the full work, i.e., 10├Ч25тАЛ=25 days.
Calculate total time for A
If A does 1/3 work in 5 days, total time is 5├Ч3=15 days.
TAтАЛ=15┬аdays
Calculate total time for B
If B does 2/5 work in 10 days, total time is 10├Ч25тАЛ=25 days.
TBтАЛ=25┬аdays
Find combined rate and total time
Using the product-sum formula: 15+2515├Ч25тАЛ=40375тАЛ.
40375тАЛ=9.375┬аdays
The calculated result is 9.375 days, which suggests an error in the provided official option A (7.5 days) as 9.375 does not match the options exactly.
Always convert partial work durations to full work durations (1 unit) before applying combined rate formulas.