Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower System
PrevNext

Overhauling is the part of____________

A

Preventive maintenance

B

Predictive maintenance

C

Breakdown maintenance

D

Routine maintenance

Correct Answer

Concept & PrincipleElectricalPower System
Option A

Preventive maintenance

Quick Summary: Overhauling is a comprehensive form of preventive maintenance involving the systematic disassembly, inspection, repair, and replacement of parts in a machine or system. It is performed at scheduled intervals to restore equipment to a 'like-new' condition, thereby extending its service life and ensuring reliability.

💡 Explanation

Overhauling is a comprehensive form of preventive maintenance involving the systematic disassembly, inspection, repair, and replacement of parts in a machine or system. It is performed at scheduled intervals to restore equipment to a 'like-new' condition, thereby extending its service life and ensuring reliability.

🔢 Key Formulas

MTBFnew=MTBFold+ΔtMTBF_{new} = MTBF_{old} + \Delta tMTBFnew​=MTBFold​+Δt — represents the extension of Mean Time Between Failures post-overhaul

⚙️ Working Principle

The principle relies on the Time-Based Maintenance (TBM) approach, where maintenance interventions are triggered by operational hours or calendar dates rather than current condition. By replacing worn or fatigue-prone components before they reach a failure state, the probability of unexpected breakdown is significantly reduced. The process typically follows a cycle: shutdown, isolation, inspection, component replacement, reassembly, and testing.

📌 Key Points
  • ▸

    Overhauling is a proactive strategy to mitigate cumulative wear and tear.

  • ▸

    It requires planned downtime, which is a major logistical consideration.

  • ▸

    It is common in rotating machinery like turbines, compressors, and diesel engines.

  • ▸

    Differs from routine maintenance which involves minor tasks like lubrication or cleaning.

✅ Advantages
  • ▸

    High reliability and reduced risk of catastrophic failure.

  • ▸

    Optimizes machine efficiency and performance parameters.

  • ▸

    Extends the operational lifecycle of capital assets.

❌ Disadvantages / Limitations
  • ▸

    High cost of labor and spare parts.

  • ▸

    Potential for unnecessary maintenance if components replaced are still functional.

  • ▸

    Requires significant planned shutdown time.

🛠️ Applications / Uses
  • ▸

    Large-scale thermal power plant turbines.

  • ▸

    Internal combustion engines after a fixed mileage.

  • ▸

    High-voltage electrical switchgear maintenance.

📄 Additional Information
  • ▸

    Predictive maintenance (Option B) uses condition monitoring (e.g., vibration analysis) rather than fixed schedules.

  • ▸

    Breakdown maintenance (Option C) is a reactive, 'fix-it-when-it-breaks' approach.

  • ▸

    Routine maintenance (Option D) refers to daily or weekly small tasks like inspection and minor adjustment.

📊 Diagram / Illustration
Maintenance HierarchyPreventive MaintenanceOverhauling
✅

A is correct — Overhauling is a scheduled, intensive preventive maintenance activity aimed at restoring equipment to its design performance standards.

Core Concepts Used
Click any tag to open in AI Tutor
Preventive Maintenance Asset Life Cycle Management Time-Based Maintenance
💡 EXAM TIP

In competitive exams, remember: If the maintenance is 'scheduled based on time', it's Preventive; if it is 'based on health data', it's Predictive.

Related Questions

ElectricalPower System
The specified quantities of Generation bus is
ElectricalPower System
When an alternator connected to the bus-bar is shut down the bus-bar voltage will
ElectricalPower System
The current drawn by the line due to corona losses is _______
ElectricalPower System
The specified quantities of load bus are
ElectricalPower System
The advantages of high transmission voltage are ______