Join 60,000+ competitive exam aspirants
A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission lines is tripped. So that output of the generator is reduced to 70 MW. Find the frequency deviation during this time?
0.56
-0.56
0.92
-0.92