Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Post contingency is the state where

A

Power system violates its limits to the parameter define

B

Power system collapse

C

Power system doesn’t run economical

D

Power system run in secure manner

Correct Answer

Concept & PrincipleElectricalPower Generation
Option A

Power system violates its limits to the parameter define

Quick Summary: A post-contingency state refers to the condition of the power system immediately following an N-1 or N-k outage (e.g., loss of a transmission line or generator). In this state, the system may operate outside of its secure thermal or voltage limits, potentially leading to instability.

💡 Explanation

A post-contingency state refers to the condition of the power system immediately following an N-1 or N-k outage (e.g., loss of a transmission line or generator). In this state, the system may operate outside of its secure thermal or voltage limits, potentially leading to instability.

🔢 Key Formulas

Spost=Sbase+ΔSS_{post} = S_{base} + \Delta SSpost​=Sbase​+ΔS

Vi,min≤Vi≤Vi,maxV_{i, min} \le V_i \le V_{i, max}Vi,min​≤Vi​≤Vi,max​

⚙️ Working Principle

When a contingency occurs, power flow re-distributes across the remaining healthy components based on Kirchhoff's laws. If this redistribution forces one or more components (lines, transformers, or busbars) to carry loads exceeding their emergency rating (Sactual>SratedS_{actual} > S_{rated}Sactual​>Srated​), the system enters an insecure post-contingency state. Corrective measures like generation redispatch or load shedding are then required to return the system to a secure operating state.

📌 Key Points
  • ▸

    Security is defined as the ability of the system to withstand contingencies without violating constraints.

  • ▸

    N-1 criterion is the industry standard for ensuring system security.

  • ▸

    Post-contingency state is transient and requires rapid control actions.

  • ▸

    Violations in this state can escalate into cascading failures.

✅ Advantages
  • ▸

    Identifies potential bottlenecks in the grid.

  • ▸

    Facilitates robust power system planning.

❌ Disadvantages / Limitations
  • ▸

    High computational cost for N-k contingency analysis.

  • ▸

    Requires high-speed automation for stability.

🛠️ Applications / Uses
  • ▸

    Real-time grid monitoring (SCADA/EMS).

  • ▸

    Power system contingency analysis and planning.

📄 Additional Information
  • ▸

    The goal of system operators is to maintain 'N-1' security, meaning the system remains stable even if the single most critical component fails.

  • ▸

    Option B (System collapse) is the result of failing to manage a post-contingency violation, not the definition of the state itself.

📊 Diagram / Illustration
System Contingency StatePre-contingency: SecurePost-contingency: Violation
✅

A is correct — A post-contingency state occurs when a power system's operating parameters, such as line flows or bus voltages, exceed their defined secure operational limits following a disturbance.

Core Concepts Used
Click any tag to open in AI Tutor
Power System Security Contingency Analysis N-1 Criterion
💡 EXAM TIP

In competitive exams, remember that 'Secure' implies satisfying all constraints (V,P,Q,IV, P, Q, IV,P,Q,I limits), while 'Insecure' implies at least one violation occurs due to a contingency.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is