Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

The installation time for a gas turbine power plant is

A

Comparatively less than thermal power plant

B

Comparatively more than thermal power plant

C

Equal to thermal power plant

D

Very much longer than thermal power plant

Correct Answer

Concept & PrincipleElectricalPower Generation
Option A

Comparatively less than thermal power plant

Quick Summary: Gas turbine power plants require significantly less installation time compared to thermal (coal-fired) power plants because they consist of compact, modular components. Thermal power plants require large-scale civil works, massive steam generators, and complex boiler setups that lead to much longer construction and commissioning periods.

💡 Explanation

Gas turbine power plants require significantly less installation time compared to thermal (coal-fired) power plants because they consist of compact, modular components. Thermal power plants require large-scale civil works, massive steam generators, and complex boiler setups that lead to much longer construction and commissioning periods.

🔢 Key Formulas

Wnet=Wturbine−WcompressorW_{net} = W_{turbine} - W_{compressor}Wnet​=Wturbine​−Wcompressor​ — Net work output of a gas turbine

ηth=1−1(rp)γ−1γ\eta_{th} = 1 - \frac{1}{(r_p)^{\frac{\gamma-1}{\gamma}}}ηth​=1−(rp​)γγ−1​1​ — Thermal efficiency based on pressure ratio

⚙️ Working Principle

The principle relies on the Brayton Cycle where air is compressed, heated, and expanded through a turbine. Because there is no need for large steam boilers, cooling towers, or extensive coal handling units, the site preparation and installation are modular and rapid.

📌 Key Points
  • ▸

    Gas turbine plants are ideal for peak load duty.

  • ▸

    Thermal plants are typically used for base load duty due to their large size and slow startup.

  • ▸

    Civil engineering requirements for gas turbines are minimal compared to the elaborate foundations required for heavy thermal power equipment.

✅ Advantages
  • ▸

    Lower capital investment

  • ▸

    Quick start-up and shutdown time

  • ▸

    Low maintenance cost

  • ▸

    Small floor area required

❌ Disadvantages / Limitations
  • ▸

    Lower overall thermal efficiency

  • ▸

    High running cost due to expensive fuel (natural gas/distillate oil)

  • ▸

    Short life span of turbine blades due to high operating temperatures

🛠️ Applications / Uses
  • ▸

    Peak load power generation

  • ▸

    Standby power units

  • ▸

    Industrial captive power plants

🔄 Comparison Table
FeatureGas TurbineThermal Plant

Installation Time

Very Short (Months)

Very Long (Years)

📄 Additional Information
  • ▸

    Thermal power plants involve complex logistics including coal transport networks and water supply systems.

  • ▸

    Option B, C, and D are incorrect because they ignore the compact and modular nature of gas turbine systems compared to the massive scale of steam-based thermal plants.

📊 Diagram / Illustration
Installation Time ComparisonGas Turbine TimeThermal Plant TimeTɢₐₛ < Tₜₕₑᵣₘₐₗ
✅

A is correct — The modular design of gas turbine plants allows for much faster installation and commissioning than large-scale coal-fired thermal power plants.

Core Concepts Used
Click any tag to open in AI Tutor
Power Generation Economics Plant Load Factor Brayton Cycle Project Management in Energy
💡 EXAM TIP

Always relate plant installation time to the complexity of the heat source; coal-fired thermal plants are complex because they require extensive boilers and steam-cycle infrastructure.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)

Loading discussion...
PrevNext