Examoogle
ExamsTest SeriesRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

The load curve describe

A

Generation with respect to load

B

Variation of load with respect to time

C

Generation with respect to time

D

None of above

Correct Answer

Concept & PrincipleElectricalPower Generation
Option B

Variation of load with respect to time

Quick Summary: A load curve is a graphical representation showing the variation of power demand (load) on a power system plotted against time. It typically plots time on the X-axis (usually over 24 hours) and the corresponding power demand in kW or MW on the Y-axis.

💡 Explanation

A load curve is a graphical representation showing the variation of power demand (load) on a power system plotted against time. It typically plots time on the X-axis (usually over 24 hours) and the corresponding power demand in kW or MW on the Y-axis.

🔢 Key Formulas

E=∫t1t2P(t)dtE = \int_{t_1}^{t_2} P(t) dtE=∫t1​t2​​P(t)dt — Total energy consumed is the integral of the load curve area

LoadFactor=AverageLoadMaximumDemandLoad Factor = \frac{Average Load}{Maximum Demand}LoadFactor=MaximumDemandAverageLoad​ — Ratio indicating efficiency of load usage

⚙️ Working Principle

The curve is constructed by recording the power consumption at specific intervals (e.g., hourly). By connecting these data points, system engineers can identify peak demand periods, base load requirements, and the total energy consumed (area under the curve). This data is essential for planning generation capacity and optimizing the dispatch of generating units.

📌 Key Points
  • ▸

    The area under the load curve represents the total energy supplied in a given time period.

  • ▸

    The highest point on the curve represents the peak demand or maximum load.

  • ▸

    Load curves help in deciding the size and number of generating units.

  • ▸

    Daily load curves show fluctuation, whereas annual load curves are used for annual planning.

✅ Advantages
  • ▸

    Helps in predicting future power requirements.

  • ▸

    Assists in selecting the capacity of generating plants to ensure economic operation.

❌ Disadvantages / Limitations
  • ▸

    Requires high-precision data collection infrastructure (smart meters).

  • ▸

    Seasonal and random fluctuations make absolute prediction difficult.

🛠️ Applications / Uses
  • ▸

    Power system operation and maintenance scheduling.

  • ▸

    Tariff determination and utility billing.

  • ▸

    Grid stability management.

📄 Additional Information
  • ▸

    A 'Load Duration Curve' is a derived graph where loads are arranged in descending order of magnitude, which is different from a standard chronologically ordered Load Curve.

  • ▸

    Option A and C are incorrect because the curve focuses on demand (load) usage, not the physical generation output capability or capacity rating.

📊 Diagram / Illustration
Time (hours)Load (MW)024
✅

B is correct — The load curve illustrates the chronological variation of power demand (load) over a specific time duration.

Core Concepts Used
Click any tag to open in AI Tutor
Power System Demand Load Profile Analysis Energy Generation Planning
💡 EXAM TIP

Always remember that the 'Area under the Load Curve' represents total MWh consumed; this is a frequent question in competitive exams.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is