Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

The reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order is known as

A

Hot reserve

B

Cold reserve

C

Spinning reserve

D

Firm power

Correct Answer

⚙️ TE • Technical Concept & PrincipleElectricalPower Generation
Option B

Cold reserve

Quick Summary:

Cold reserve refers to generating capacity that is available for service but is not currently in operation and requires a significant amount of time to be brought online. This capacity is kept in working order, often in a shut-down state, to act as a long-term backup for power systems during maintenance or unexpected outages.

⚙️TETechnical SolutionConcept & Principle
💡 Explanation

Cold reserve refers to generating capacity that is available for service but is not currently in operation and requires a significant amount of time to be brought online. This capacity is kept in working order, often in a shut-down state, to act as a long-term backup for power systems during maintenance or unexpected outages.

🔢 Key Formulas

Rtotal=Pmax−PdemandR_{total} = P_{max} - P_{demand}Rtotal​=Pmax​−Pdemand​ — representing the total reserve capacity in a power system.

⚙️ Working Principle

In power system operations, reserves are classified by their readiness. A cold reserve unit is disconnected from the grid and its boiler/prime mover is usually cold. Bringing it online involves startup procedures such as warming the boiler, pressurizing steam lines, and synchronizing the generator, which can take several hours.

📌 Key Points
  • ▸

    Cold reserve is not synchronized with the grid.

  • ▸

    It has the longest startup time among reserve types.

  • ▸

    It is cost-effective as it consumes zero fuel while idle.

  • ▸

    Essential for reliability planning in grid management.

✅ Advantages
  • ▸

    No fuel consumption during idle periods

  • ▸

    Reduces operational wear and tear on auxiliary equipment

  • ▸

    Provides long-term security against major plant failures

❌ Disadvantages / Limitations
  • ▸

    High response time (cannot meet sudden load spikes)

  • ▸

    Requires significant startup energy and time

  • ▸

    Higher risk of equipment degradation if not maintained during idle state

🛠️ Applications / Uses
  • ▸

    Seasonal peak load management

  • ▸

    Backup for planned maintenance outages

  • ▸

    Long-term contingency planning

🔄 Comparison Table
FeatureSpinning ReserveCold Reserve

Startup Time

Minutes

Hours

Grid Sync

Yes

No

📄 Additional Information
  • ▸

    Spinning reserve refers to units connected to the bus and synchronized, ready to pick up load instantly.

  • ▸

    Hot reserve refers to units ready to be started but not synchronized, requiring less time than cold reserve.

📊 Diagram / Illustration
Active UnitsCold ReserveMaintenance/Power System Hierarchy
✅

B is correct — Cold reserve is generating capacity that is kept in working order but is currently idle, requiring a significant warm-up period to supply power.

Core Concepts Used
Click any tag to open in AI Tutor
Power System Reliability Reserve Capacity Management Load-Frequency Control
💡 EXAM TIP

Always differentiate reserves by 'readiness': Spinning is instant (synchronized), Hot is fast (ready), and Cold is slow (needs startup).

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-2003?
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)