Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Which element of hydroelectric power plant prevents the penstock from water hammer phenomenon?

A

Valves and Gates

B

Draft tubes

C

Spillway

D

Surge Tank

Correct Answer

Concept & PrincipleElectricalPower Generation
Option D

Surge Tank

Quick Summary:

A surge tank is a small reservoir or tank connected to the penstock of a hydroelectric power plant. It acts as a pressure buffer, preventing the dangerous pressure rise known as 'water hammer' caused by sudden fluctuations in water velocity when load changes.

💡 Explanation

A surge tank is a small reservoir or tank connected to the penstock of a hydroelectric power plant. It acts as a pressure buffer, preventing the dangerous pressure rise known as 'water hammer' caused by sudden fluctuations in water velocity when load changes.

🔢 Key Formulas

P=ρ⋅v⋅a⋅cP = \rho \cdot v \cdot a \cdot cP=ρ⋅v⋅a⋅c — where PPP is the pressure rise, ρ\rhoρ is water density, vvv is velocity change, and ccc is wave celerity

ΔH=Lg⋅dvdt\Delta H = \frac{L}{g} \cdot \frac{dv}{dt}ΔH=gL​⋅dtdv​ — head rise due to flow retardation

⚙️ Working Principle

When a turbine load is suddenly rejected, the governor closes the gates, leading to a sudden stoppage of water flow. Without a surge tank, the momentum of the moving water column would create a massive pressure surge (water hammer) in the penstock, potentially causing it to rupture. The surge tank provides an open surface where the water can rise, absorbing the kinetic energy and converting it into potential energy (head), thereby mitigating the pressure spike.

📌 Key Points
  • ▸

    Water hammer occurs due to sudden change in velocity (Inertia of water)

  • ▸

    Surge tanks effectively shorten the length of the penstock subjected to high-pressure waves

  • ▸

    Located as close to the powerhouse as possible

  • ▸

    Provides immediate supply of water during load acceptance

✅ Advantages
  • ▸

    Protects the penstock from rupture

  • ▸

    Stabilizes the turbine speed during sudden load fluctuations

❌ Disadvantages / Limitations
  • ▸

    Adds significant construction cost

  • ▸

    Requires high topographical elevation for installation

🛠️ Applications / Uses
  • ▸

    High and medium head hydroelectric power plants

  • ▸

    Pumped storage power plants

📄 Additional Information
  • ▸

    Draft tubes are used to recover kinetic energy from water leaving the turbine runner.

  • ▸

    Spillways are used to discharge excess flood water from the reservoir.

  • ▸

    The phenomenon is governed by the relation between the closing time of the valve and the wave propagation time t=2Lct = \frac{2L}{c}t=c2L​.

📊 Diagram / Illustration
Surge TankPenstockTurbine
✅

D is correct — The surge tank acts as a shock absorber to neutralize pressure surges in the penstock during sudden changes in turbine load.

Core Concepts Used
Click any tag to open in AI Tutor
Water Hammer Phenomenon Hydroelectric Power Plant Hydraulics Pressure Transient Management
💡 EXAM TIP

Remember that surge tanks are specifically meant for load rejection, whereas the draft tube is strictly a component of the turbine assembly used for efficiency recovery.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-2003?
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is