Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Who coordinates for trans-national exchange of power?

A

NLDC

B

ERLDC

C

NERLDC

D

NRLDC

Correct Answer

Concept & PrincipleElectricalPower Generation
Option A

NLDC

Quick Summary: The National Load Despatch Centre (NLDC) is the apex body responsible for the optimum scheduling and dispatch of electricity on an all-India basis. It acts as the nodal agency for coordinating trans-national power exchanges, including inter-country interconnections with neighbors like Nepal, Bhutan, and Bangladesh.

💡 Explanation

The National Load Despatch Centre (NLDC) is the apex body responsible for the optimum scheduling and dispatch of electricity on an all-India basis. It acts as the nodal agency for coordinating trans-national power exchanges, including inter-country interconnections with neighbors like Nepal, Bhutan, and Bangladesh.

🔢 Key Formulas

Ptrans=V1V2Xsin⁡(δ)P_{trans} = \frac{V_1 V_2}{X} \sin(\delta)Ptrans​=XV1​V2​​sin(δ) — Represents the real power flow across international interconnections based on voltage magnitude and phase angle difference.

⚙️ Working Principle

NLDC functions under the Power System Operation Corporation (POSOCO/GRID-INDIA) and oversees the regional load despatch centres (RLDCs). It manages the grid security, real-time grid monitoring, and the commercial coordination of cross-border power flows by interfacing with the transmission licensees and regulatory authorities of respective countries.

📌 Key Points
  • ▸

    NLDC is established under the Electricity Act, 2003.

  • ▸

    It maintains the All-India Synchronous Grid stability.

  • ▸

    Coordinates cross-border power flow with the Ministry of External Affairs and Ministry of Power.

  • ▸

    It serves as the central nodal agency for inter-regional scheduling.

✅ Advantages
  • ▸

    Optimized resource utilization across borders.

  • ▸

    Enhanced regional energy security and grid reliability.

❌ Disadvantages / Limitations
  • ▸

    Complex regulatory coordination between nations.

  • ▸

    Increased risk of grid disturbances spreading across national boundaries.

🛠️ Applications / Uses
  • ▸

    Exporting surplus hydro power from Bhutan to India.

  • ▸

    Coordinated power balancing between India and Nepal/Bangladesh.

📄 Additional Information
  • ▸

    Option B (ERLDC), C (NERLDC), and D (NRLDC) are Regional Load Despatch Centres (RLDCs) that handle regional power flow and scheduling within India but do not coordinate the national-level trans-national agreements independently of NLDC.

📊 Diagram / Illustration
Trans-national Power Coordination HierarchyNLDC (India)Neighbor ANeighbor BNeighbor C
✅

A is correct — NLDC is the central nodal agency responsible for the coordination of trans-national power exchanges.

Core Concepts Used
Click any tag to open in AI Tutor
Load Dispatch Hierarchy Grid Security International Power Trade
💡 EXAM TIP

Always remember that while RLDCs handle regional grids, the NLDC acts as the unified 'brain' for national and international grid integration and policy enforcement.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)

Loading discussion...
PrevNext