Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Gujarat state load dispatch center is situated at

A

Ahmedabad

B

Vadodara

C

Surat

D

Rajkot

Correct Answer

Concept & PrincipleElectricalPower Generation
Option B

Vadodara

Quick Summary: The State Load Dispatch Center (SLDC) for Gujarat is located in Gotri, Vadodara. It acts as the apex body to ensure the integrated operation of the power system in the state.

💡 Explanation

The State Load Dispatch Center (SLDC) for Gujarat is located in Gotri, Vadodara. It acts as the apex body to ensure the integrated operation of the power system in the state.

🔢 Key Formulas

P=3VLILcos⁡ϕP = \sqrt{3} V_L I_L \cos \phiP=3​VL​IL​cosϕ — represents real power flow monitored by the SLDC

⚙️ Working Principle

The SLDC operates under the State Transmission Utility (STU), specifically GETCO (Gujarat Energy Transmission Corporation Ltd). It is responsible for real-time grid monitoring, frequency control, load forecasting, and scheduling of electricity to ensure grid stability and reliability according to the Indian Electricity Grid Code (IEGC).

📌 Key Points
  • ▸

    SLDC coordinates power flow within the state.

  • ▸

    It is mandated under Section 31 of the Electricity Act, 2003.

  • ▸

    Functions include scheduling, dispatching, and metering.

  • ▸

    The Gujarat SLDC is operated by GETCO.

✅ Advantages
  • ▸

    Ensures real-time grid reliability

  • ▸

    Prevents blackouts through load management

❌ Disadvantages / Limitations
  • ▸

    High complexity in balancing variable renewable generation

  • ▸

    Requires constant communication infrastructure

🛠️ Applications / Uses
  • ▸

    Energy accounting and auditing

  • ▸

    Transmission congestion management

📄 Additional Information
  • ▸

    The SLDC is the nerve center of the state grid.

  • ▸

    Ahmedabad is the administrative capital, but the technical control center for the grid is situated in Vadodara.

📊 Diagram / Illustration
Gujarat Power Grid HierarchyRLDC (Regional)SLDC (Vadodara)
✅

B is correct — The Gujarat State Load Dispatch Center (SLDC) is strategically headquartered in Vadodara to manage the state's power network.

Core Concepts Used
Click any tag to open in AI Tutor
Grid Management Load Dispatching Power System Security
💡 EXAM TIP

Remember that while major power utilities often have head offices in state capitals, technical Load Dispatch Centers (LDCs) are frequently located near major transmission substations or specific hubs identified during grid planning.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)

Loading discussion...
PrevNext