Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Main function of NLDC is

A

Prepare Policy of power grid

B

Prepare Grid code

C

Supervision over all RLDC

D

All of above

Correct Answer

Concept & PrincipleElectricalPower Generation
Option C

Supervision over all RLDC

Quick Summary: The National Load Despatch Centre (NLDC) is the apex body mandated under the Electricity Act 2003 to ensure integrated operation of the power system in India. Its primary function is to supervise the Regional Load Despatch Centres (RLDCs) to ensure grid stability and reliability at the national level.

💡 Explanation

The National Load Despatch Centre (NLDC) is the apex body mandated under the Electricity Act 2003 to ensure integrated operation of the power system in India. Its primary function is to supervise the Regional Load Despatch Centres (RLDCs) to ensure grid stability and reliability at the national level.

🔢 Key Formulas

f=12πLCf = \frac{1}{2\pi\sqrt{LC}}f=2πLC​1​ — Fundamental relationship for grid frequency control

Pflow=V1V2Xsin⁡(δ)P_{flow} = \frac{V_1 V_2}{X} \sin(\delta)Pflow​=XV1​V2​​sin(δ) — Power flow equation monitored by NLDC

⚙️ Working Principle

NLDC acts as the strategic coordinator between Regional Load Despatch Centres (RLDCs). It manages the national grid by monitoring inter-regional power flows, managing national transmission constraints, and facilitating energy accounting/billing through the POSOCO (now GRID-INDIA) framework. It does not formulate grid codes or power policies directly, which are the domains of the CERC and Ministry of Power, respectively.

📌 Key Points
  • ▸

    NLDC is the apex body for integrated operation of the national power grid.

  • ▸

    Functions include scheduling of inter-regional power transfers and monitoring real-time grid parameters.

  • ▸

    Operates under the administrative control of GRID-INDIA (formerly POSOCO).

  • ▸

    Works in coordination with Regional Load Despatch Centres (RLDCs) and State Load Despatch Centres (SLDCs).

✅ Advantages
  • ▸

    Enhanced national grid security and stability

  • ▸

    Optimized inter-regional power transmission

❌ Disadvantages / Limitations
  • ▸

    High dependence on communication infrastructure

  • ▸

    Complex coordination requirements across diverse states

🛠️ Applications / Uses
  • ▸

    Real-time grid frequency monitoring

  • ▸

    Inter-regional energy scheduling and accounting

📄 Additional Information
  • ▸

    NLDC was established under Section 26 of the Electricity Act 2003.

  • ▸

    Policy formulation is the responsibility of the Ministry of Power, and Grid Code preparation is governed by CERC regulations.

📊 Diagram / Illustration
National Power Grid HierarchyNLDC (National)RLDC (Regional)SLDC (State)
✅

C is correct — The main statutory function of the NLDC is to exercise supervision and control over all Regional Load Despatch Centres (RLDCs) to ensure the integrated, secure, and efficient operation of the national power system.

Core Concepts Used
Click any tag to open in AI Tutor
National Load Despatch Centre (NLDC) Power System Hierarchy Grid Stability and Control
💡 EXAM TIP

Always remember that NLDC 'supervises/coordinates' (operational function) rather than 'legislates/defines' (policy/coding function) to distinguish it from CERC/Ministry roles.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is