Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

POSOCO was formed in ___________to handle the power management function of PGCIL.

A

March-2010

B

April-2009

C

March-2009

D

December-2001

Correct Answer

Concept & PrincipleElectricalPower Generation
Option C

March-2009

Quick Summary: POSOCO (Power System Operation Corporation Limited), now known as Grid Controller of India Limited, was incorporated in March 2009. It was established as a wholly-owned subsidiary of PGCIL to effectively handle the power management functions of India's national and regional grids.

💡 Explanation

POSOCO (Power System Operation Corporation Limited), now known as Grid Controller of India Limited, was incorporated in March 2009. It was established as a wholly-owned subsidiary of PGCIL to effectively handle the power management functions of India's national and regional grids.

🔢 Key Formulas

Grid Reliability=1Loss of Load ProbabilityGrid\ Reliability = \frac{1}{Loss\ of\ Load\ Probability}Grid Reliability=Loss of Load Probability1​

System Security=f(V,δ,P,Q)System\ Security = f(V, \delta, P, Q)System Security=f(V,δ,P,Q)

⚙️ Working Principle

The restructuring was driven by the need for independent system operation. By separating the transmission owning entity (PGCIL) from the system operating entity (POSOCO), the Ministry of Power ensured that the Load Despatch Centres (LDCs) operate neutrally, ensuring non-discriminatory access to the grid for all market participants.

📌 Key Points
  • ▸

    POSOCO handles the operation of National Load Despatch Centre (NLDC) and Regional Load Despatch Centres (RLDCs).

  • ▸

    It was created to ensure open access and non-discriminatory grid operations.

  • ▸

    In 2022, POSOCO was officially renamed to Grid Controller of India Limited to better reflect its function.

  • ▸

    It is responsible for the overall monitoring of the grid and management of power transactions.

✅ Advantages
  • ▸

    Neutral and transparent grid operation

  • ▸

    Improved grid security and stability

  • ▸

    Effective implementation of electricity market mechanisms

🛠️ Applications / Uses
  • ▸

    Real-time grid management

  • ▸

    Power system contingency analysis

  • ▸

    Inter-state transmission system (ISTS) scheduling

📄 Additional Information
  • ▸

    PGCIL (Power Grid Corporation of India Limited) acts as the Central Transmission Utility (CTU).

  • ▸

    March 2009 represents the incorporation date under the Companies Act, 1956.

  • ▸

    April 2009 (Option B) is often confused as the date when it started formal operations independently.

📊 Diagram / Illustration
Power Sector Restructuring (2009)PGCIL (Transmission)POSOCO (Operation)Independent System Operation ensured
✅

C is correct — POSOCO was incorporated in March 2009 as a subsidiary of PGCIL to function as the independent system operator for the Indian power grid.

Core Concepts Used
Click any tag to open in AI Tutor
Grid Management System Operation Power Sector Regulation
💡 EXAM TIP

Always remember that POSOCO handles the 'Operational' side (Load Despatch), whereas PGCIL handles the 'Asset' side (Transmission lines/substations).

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is