Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

If the daily load curve is divided by 24, what does this curve represent?

A

Average load for the day

B

Connected load

C

Maximum demand

D

Demand factor

Correct Answer

⚙️ TE • Technical Concept & PrincipleElectricalPower Generation
Option A

Average load for the day

Quick Summary:

The daily load curve represents the variation of load on a power station over a 24-hour period. Dividing the total energy consumed (area under the load curve) by 24 hours yields the average load for that day.

⚙️TETechnical SolutionConcept & Principle
💡 Explanation

The daily load curve represents the variation of load on a power station over a 24-hour period. Dividing the total energy consumed (area under the load curve) by 24 hours yields the average load for that day.

🔢 Key Formulas

Average Load=Total Energy Generated in 24 hours24\text{Average Load} = \frac{\text{Total Energy Generated in 24 hours}}{24}Average Load=24Total Energy Generated in 24 hours​

Load Factor=Average LoadMaximum Demand\text{Load Factor} = \frac{\text{Average Load}}{\text{Maximum Demand}}Load Factor=Maximum DemandAverage Load​

⚙️ Working Principle

The daily load curve plots the power demand (MW or kW) on the Y-axis against time (hours) on the X-axis. Mathematically, the area under this curve represents the total energy (MWh) generated in a day. By dividing this energy value by the total duration of 24 hours, we compute the constant load that would consume the same amount of energy over the same period, known as the average load.

📌 Key Points
  • ▸

    The average load is always less than the maximum demand.

  • ▸

    The ratio of average load to maximum demand is known as the Load Factor.

  • ▸

    Higher load factor indicates more efficient utilization of power station capacity.

✅ Advantages
  • ▸

    Useful for calculating the energy consumption of the plant.

  • ▸

    Helps in determining the load factor which indicates the economic viability of the plant.

🛠️ Applications / Uses
  • ▸

    Used in tariff calculations and cost analysis for electricity billing.

  • ▸

    Helps utility companies in scheduling power generation units.

📄 Additional Information
  • ▸

    Connected load refers to the sum of continuous ratings of all equipment connected to the supply system.

  • ▸

    Maximum demand is the highest load that occurred on the power station during a given period.

  • ▸

    Demand factor is defined as the ratio of maximum demand to the connected load.

📊 Diagram / Illustration
Time (Hours)Load (MW)Average Load
✅

A is correct — The average load for a day is defined as the total energy consumed (area under the load curve) divided by the total time of 24 hours.

Core Concepts Used
Click any tag to open in AI Tutor
Load Curve Average Load Power System Economics
💡 EXAM TIP

Always remember that the Load Factor is always ≤1\le 1≤1. If your calculated load factor is greater than 1, you have likely swapped the Average Load and Maximum Demand in the formula.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-2003?
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)